Advertisement

Business & Finance

about 12 years ago

ZPMC Signs Wind Farm Installation Vessel Deal

Shanghai Zhenhua Heavy Industries (ZPMC) has signed a contract with CCCC Third Harbor Engineering for the construction of China’s most advanced wind farm installation vessel. The vessel with a 1000-ton capacity will be equipped with the latest jack up system developed by ZPMC. It will feature a hydr

1 minutes read

Shanghai Zhenhua Heavy Industries (ZPMC) has signed a contract with CCCC Third Harbor Engineering for the construction of China’s most advanced wind farm installation vessel.

The vessel with a 1000-ton capacity will be equipped with the latest jack up system developed by ZPMC.

It will feature a hydraulic lifting system that uses cylindrical legs enabling it to work in water depths of up to 40 meters.

Compared with conventional rack and pinion lift system, the new system lasts longer and is highly reliable, which makes it suitable for frequent lifting of installation vessels and platform.

In addition, ZPMC R&D team developed a second-generation hydraulic pile gripper to better cope with offshore operation conditions, thus improving performance in piling precision.

ZPMC has long been involved in the field of wind power equipment. It offers an 800-ton offshore wind farm installation vessel and platform.

Advertisement

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.