Advertisement

Business & Finance

about 12 years ago

Jan De Nul’s Tiger Protects Butendiek OWF Monopiles

Jan De Nul Group is in charge of the installation of scour protection for the 80 monopiles of the offshore wind farm Butendiek, located in the North Sea west of Sylt. The filter rock, approximately 71,000 tonnes, was loaded at the quarry and installed by the Fall Pipe Vessel Simon Stevin before inst

1 minutes read

Jan De Nul Group is in charge of the installation of scour protection for the 80 monopiles of the offshore wind farm Butendiek, located in the North Sea west of Sylt.

The filter rock, approximately 71,000 tonnes, was loaded at the quarry and installed by the Fall Pipe Vessel Simon Stevin before installation of the monopile.

The armour rock, approximately 123,000 tonnes, was installed by the vessel Tiger . In view of the large size of up to 1 m, the existing vessel Tiger was equipped with a 2 meter diameter inclined fall pipe to execute the works. The rock was purchased at a Norwegian quarry.

Jan De Nul disposes of an in-house engineering department which designs new equipment or works out modifications to existing material to promptly respond to specific needs. Transforming Tiger into a Dynamic Positioned Rock Installation Vessel within a period of 3 months is a perfect example of this.

[mappress mapid=”14174″]

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.