Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›Gargantuan Beauty Arrives on Her Mighty Servant (VIDEO)
News

August 22, 2014 · about 12 years ago

Gargantuan Beauty Arrives on Her Mighty Servant (VIDEO)

DolWin beta, the offshore HVDC platform that will connect three offshore wind farms in the German part of the North Sea, arrived in Haugesund last night, carried by Dockwise’s heavy-lift ship Mighty Servant 1. DolWin beta was built by Dubai Drydocks World, which was subcontracted by Aibel AS. Aibel

1 minutes read
  • LinkedIn
  • X
  • Email

DolWin beta, the offshore HVDC platform that will connect three offshore wind farms in the German part of the North Sea, arrived in Haugesund last night, carried by Dockwise’s heavy-lift ship Mighty Servant 1.

DolWin beta was built by Dubai Drydocks World, which was subcontracted by Aibel AS. Aibel developed the platform jointly with ABB, main contractor for TenneT’s Dolwin2 project.

Check out the video of the platform’s arrival to Aibel’s yard:

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1GS Entec Completes Monopile Factory in Korea
  2. 2PGE and Ørsted Add BGB Group to Baltica 2 Offshore Wind Team
  3. 3Fugro Wins UXO Survey Contract for German Offshore Grid Connections
  4. 4Seaway7 Completes Inter-Array Cable Installation at East Anglia Three Offshore Wind Farm

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free