Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›UAE: DolWin Structure Components in Position
Wind Farm Update

December 9, 2013 · about 13 years ago

UAE: DolWin Structure Components in Position

Drydocks World lifted the 10,000-tonne topside of the first gravity base of the semi-submersible and world’s largest offshore HVDC platform structure DolWin beta to a height of 52.8 metres from the dock bottom. On Saturday the substructure was moved in position under the topside. Project Director at

1 minutes read
  • LinkedIn
  • X
  • Email

Drydocks World lifted the 10,000-tonne topside of the first gravity base of the semi-submersible and world’s largest offshore HVDC platform structure DolWin beta to a height of 52.8 metres from the dock bottom.

On Saturday the substructure was moved in position under the topside. Project Director at Aibel, Kjetil V. Jacobsen, reported that the mating operation so far has gone as planned. The weather has been good, with very little wind. The last part of the operation will be to lower the topside on to the substructure.

The jacking-up started last week.

His Excellency Khamis Juma Buamim, Chairman of Drydocks World & Maritime World said, “We have taken our engineering excellence to greater heights through this unique and remarkable feat. It is a significant first and speaks volumes of our strengths in terms of technical capabilities. I am sure that the future will bring even more challenging assignments and we will handle them with equal ease. This heavy lift is a hallmark anywhere in the world and in our involvement with offshore projects. In the months ahead we look forward to greater achievements in our operations which will place us on par, if not ahead, with the best in the business.”

[mappress]

Offshore WIND staff, December 9, 2013; Image: abel

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Wind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Subsea Micropiles to Build Manufacturing Facility at Montrose Port
  2. 2Equinor Assembles Celtic Sea Offshore Wind Scoping Report Team
  3. 3Greenpeace Threatens Legal Action Over Crown Estate Fees for Morgan Offshore Wind Farm
  4. 4Acta Marine Christens CSOV Chartered by Vestas

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free