Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›VIDEO: Launching of Siem Moxie
News

September 16, 2013 · about 13 years ago

VIDEO: Launching of Siem Moxie

Designed for specific tasks in wind farms in the North Sea as well as in the Atlantic, “Siem Moxie” is an infield support vessel (ISV) that will be put into operation in spring 2014. The work boat has a length of 74 meters and a beam of 17 meters and will be the first X-BOW […]

1 minutes read
  • LinkedIn
  • X
  • Email

Designed for specific tasks in wind farms in the North Sea as well as in the Atlantic, “Siem Moxie” is an infield support vessel (ISV) that will be put into operation in spring 2014.

The work boat has a length of 74 meters and a beam of 17 meters and will be the first X-BOW vessel equipped with Voith Schneider Propellers.

The “Siem Moxie” will not only allow faster transfers of up to 60 crew to the wind farms but will also ensure more efficient operation under DP conditions. Given the more stable position of the vessel, even adverse sea and wind conditions still permit work to be carried out on the 200 square meter work deck as well as close to the offshore units.

Once the “Siem Moxie” has reached her operating site, engineers can safely cross to the individual wind turbines using a gangway with a wave compensation unit – a process during which the advantages of the Voith roll stabilization and the two VSP are at their most impressive.

In addition to wind farm tasks, the Norwegian owner Siem Offshore AS intends to use the “Siem Moxie” for cable laying operations in the North Sea and in the Atlantic. The vessel is currently being built by the Fjellstrand AS shipyard in Norway.

Check out the following video that shows the launch ceremony for “Siem Moxie”:

[mappress]

Offshore WIND Staff, September 16, 2013

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1All Monopiles In at Nordlicht I Offshore Wind Farm
  2. 2IWS Fleet Orders Four New Skywalker-Class CSOVs for EUR 260 Million
  3. 3Windward Offshore Officially Names Third CSOV
  4. 4Boskalis to Install Inter-Array Cables at 1 GW Dutch Offshore Wind Farm

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free