Advertisement

Technology

about 13 years ago

UK: SHI’s 7 MW Wind Turbine Jacket on Its Way to Installation Site (VIDEO)

Samsung Heavy Industries’ (SHI) offshore wind turbine jacket began its journey toward Energy Park Fife in Methil this weekend, Paisley.org.uk writes. The jacket was manufactured by Steel Engineering Ltd., based in Renfrew, and was loaded on a 60-metre barge on Saturday, when it started its voyage to

1 minutes read

Samsung Heavy Industries’ (SHI) offshore wind turbine jacket began its journey toward Energy Park Fife in Methil this weekend, Paisley.org.uk writes.

The jacket was manufactured by Steel Engineering Ltd., based in Renfrew, and was loaded on a 60-metre barge on Saturday, when it started its voyage to the site where it will be installed. This 500 tone heavy wind turbine jacket, an integral part of the SHI’s 7 MW offshore wind prototype, is scheduled to be installed this month.

SHI plans to completely erect the 7 MW turbine and put it in operation by the end of this year.

The following video shows the jacket being loaded onto the barge and starting its trip:

[mappress] Offshore WIND Staff, September 2, 2013

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.