offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›R&D›Denmark: Vestas’ Test Bench Starts Operating
R&D

August 19, 2013 · about 13 years ago

Denmark: Vestas’ Test Bench Starts Operating

The largest and most powerful test bench in the industry has started operation at Vestas’ global testing centre in Aarhus, Denmark. The 20 MW test bench is capable of testing the full nacelle of the V164-8.0 MW, validating the performance, robustness and reliability of the turbine over a simulated 2

2 minutes read
  • LinkedIn
  • X
  • Email

The largest and most powerful test bench in the industry has started operation at Vestas’ global testing centre in Aarhus, Denmark. The 20 MW test bench is capable of testing the full nacelle of the V164-8.0 MW, validating the performance, robustness and reliability of the turbine over a simulated 25-year lifetime.

The test bench is 42 meters long and 9 meters wide. The total weight of the test bench, including the motors, wind simulator and generators is nearly 700 tonnes. Vestas installed fifty meter deep concrete foundations to support the weight. Motors powering the bench produce 20 MW- the equivalent of 26,820 brake horsepower, and the torque exerted on the components of the turbine can be up to a massive 18 meganewton metres.

The enormous test bench will stress the drivetrain, including the gearbox, main shaft and generator of the V164-8.0 MW – in a controlled environment – reproducing the harsh wind conditions in the North Sea, using a comprehensive and rigorous test regime based on experience and data gathered from over 25,000 turbines.

Improving testing capabilities

Chief Technology Officer Anders Vedel explains the testing of the critical components and systems of the V164-8.0 MW is part of Vestas’ product development process to ensure the highest possible industry leading quality and reliability.

“ Vestas has invested in the industry’s most powerful test bench to ensure the turbine will perform in challenging conditions for 25 years. The superior testing expertise we have accumulated over the last decade is a key part of giving confidence to our customers that the machine is of the high quality that they expect from Vestas, ” he says.

During the last two years Vestas has invested in unique testing capabilities covering all the systems and critical components for its V164-8.0 MW turbine. Vestas’ entire existing and future product portfolio will also benefit from these new and unique testing capabilities.

Press release, August 19, 2013; Image: Vestas

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnology

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1DWT Returns to Riffgat Offshore Wind Farm
  2. 2Formosa 6 Offshore Wind Farm and Star Trade Enter Corporate Power Purchase Agreement
  3. 3TetraSpar Floater Completes Five-Year Testing Campaign Offshore Norway
  4. 4Standardization and Industrialization Could Cut Offshore Wind Costs in North Sea by 28% - Study

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free