offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›Top News of the Week May 6 – 12, 2013
News

May 12, 2013 · about 13 years ago

Top News of the Week May 6 – 12, 2013

Denmark: Dong Saves Three Days Per Installed Cable Each time, a cable is installed between wind turbines at an offshore wind farm, time spent offshore can be reduced by approximately three days. A new cable laying concept from DONG Energy points the way to reducing costs. First Wind Turbine Installe

1 minutes read
  • LinkedIn
  • X
  • Email

Denmark: Dong Saves Three Days Per Installed Cable

Each time, a cable is installed between wind turbines at an offshore wind farm, time spent offshore can be reduced by approximately three days. A new cable laying concept from DONG Energy points the way to reducing costs.

First Wind Turbine Installed at Riffgat Offshore Wind Farm (Germany)

The first of a total of 30 wind turbines for EWE’s Riffgat offshore wind farm at the North Sea has been installed.

France: Alstom 6MW Offshore Wind Turbine Completes Power Performance Measurement

Alstom’s new-generation Haliade™ 150 – 6MW offshore wind turbine has successfully obtained the IEC power performance measurement (power curve) after 3 months of performance measurements at Le Carnet site, in France.

South Korean Inventor Designs Combined Offshore Power Generation Structure

The World Intellectual Property Organization (WIPO) published a patent of a combined offshore power generation structure on May 2, designed by a South Korean inventor Hwal Jin Jang.

Global Tech I Transformer Station Successfully Installed (Germany)

The transformer station for the offshore wind farm Global Tech I has been successfully installed. The offshore platform is a core element of the North Sea wind farm: The power from its 80 wind turbines is gathered here and transformed from 30 to 155 kilovolts.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Four Baltica 2 Offshore Substations Set Sail from Vietnam to Poland
  2. 2X1 Wind Closes Strategic Funding Round Ahead of 8.5 MW Floater Deployment
  3. 3RWE, Masdar Team Up for 2027 German Offshore Wind Auctions
  4. 4European Project Completes First Tests of Modular Drivetrain for Offshore Wind Turbines Beyond 15 MW

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free