offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›EEW SPC to Provide Monopiles, TPs for EnBW Baltic 2 (Germany)
News

April 18, 2013 · about 13 years ago

EEW SPC to Provide Monopiles, TPs for EnBW Baltic 2 (Germany)

After already manufacturing the foundations for the OWF EnBW Baltic 1, EEW Special Pipe Constructions GmbH has now also been appointed with the delivery of 123 Pin Piles (Lot 2) as well as 39 Monopiles and Transition Pieces (Lot 3) for EnBW Baltic 2. The MPs/TPs will be manufactured in a joint ventu

2 minutes read
  • LinkedIn
  • X
  • Email

Normal 0 21 false false false DE X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-ansi-language:DE; mso-fareast-language:EN-US;}

After already manufacturing the foundations for the OWF EnBW Baltic 1, EEW Special Pipe Constructions GmbH has now also been appointed with the delivery of 123 Pin Piles (Lot 2) as well as 39 Monopiles and Transition Pieces (Lot 3) for EnBW Baltic 2.

The MPs/TPs will be manufactured in a joint venture with Bladt Industries (Denmark). Contracts have been officially signed in Hamburg in September 2012 and in February 2013 with the customer, the ARGE Baltic 2 Foundations consisting of HOCHTIEF Offshore Crewing, HOCHTIEF Solutions AG and GeoSea NV, who are responsible for the design, manufacturing, transport, and installing the foundations.

The wind farm EnBW Baltic 2 is virtually at EEW SPC`s front door. The final customer EnBW Energie Baden-Württemberg AG is planning to bring the wind farm in the Baltic Sea into service in 2014. EnBW Baltic 2, with its 80 wind power stations with 3,6 megawatt each, is four times the size of EnBW Baltic 1.

The 20,000 tons of pin piles are already being produced and will be manufactured by June 2013. Production of the Monopiles/Transition Pieces will begin in May 2013.

Considering the current order intake, EEW SPC has participated in the installation of near to 1,000 WTGs as manufacturer of foundations.

[mappress]

Press release, April 18, 2013; Image: EnBW

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1X1 Wind Closes Strategic Funding Round Ahead of 8.5 MW Floater Deployment
  2. 2RWE, Masdar Team Up for 2027 German Offshore Wind Auctions
  3. 3European Project Completes First Tests of Modular Drivetrain for Offshore Wind Turbines Beyond 15 MW
  4. 4Ørsted Gets Final Opinion in Double Taxation Case Over Two UK Offshore Wind Farms

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free