Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Tenders Invited for BorWin3 Offshore Electrical Distribution (Germany)
Contracts & Tenders

April 4, 2013 · about 13 years ago

Tenders Invited for BorWin3 Offshore Electrical Distribution (Germany)

DC Netz BorWin3 GmbH is inviting tenders for offshore electrical distribution related to BorWin3. The invited tenders are for transmission system of electric power (approximately 900 MW) between the offshore wind farms in the cluster BorWin and a grid connection point on land. In particular, the tra

1 minutes read
  • LinkedIn
  • X
  • Email

Normal 0 21 false false false BS-LATN-BA X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-fareast-language:EN-US;}

DC Netz BorWin3 GmbH is inviting tenders for offshore electrical distribution related to BorWin3.

The invited tenders are for transmission system of electric power (approximately 900 MW) between the offshore wind farms in the cluster BorWin and a grid connection point on land.

In particular, the transmission power, the losses, the availability and compliance with the Grid Code as a requirement for this power transmission system can be defined.

This application can especially include: planning, engineering, construction and, if necessary, service and maintenance for a period of at least 3 years, including an extension option. The application can possibly include dismantling.

[mappress]

Offshore WIND Staff, April 4, 2013; Image: britned

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Contracts & TendersGrid Connection

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1IFM Investors to Acquire Majority Stake in UK Port Operator ABP
  2. 2TenneT and NKT Jointly Explore Offshore Cable Decommissioning
  3. 3GEOxyz Conducting Seabed Survey at East Anglia Two Offshore Wind Site
  4. 4US Gov’t Seeks New Review of US Wind’s Maryland Project

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free