Advertisement

Technology

about 14 years ago

Germany: The Switch to Participate in Husum WindEnergy

The Switch will participate in Husum WindEnergy 2012 on September 18 – 22 at booth #F06 in hall 2 in Messe Husum, Germany. The Switch is a leading supplier of megawatt-class permanent magnet generator (PMG) and full-power converter (FPC) packages for wind power and other renewable energy application

1 minutes read

The Switch will participate in Husum WindEnergy 2012 on September 18 – 22 at booth #F06 in hall 2 in Messe Husum, Germany.

The Switch is a leading supplier of megawatt-class permanent magnet generator (PMG) and full-power converter (FPC) packages for wind power and other renewable energy applications.

The company offers proven engineering designs, flexible production capacity and local service, wherever needed.

The Switch evolved in 2006 from the joint forces of three innovative companies – Rotatek, Verteco and Youtility. As a new player in the market, it brings a fresh approach to the business. At the same time, it combines 25 years of expertise from three well-respected organizations.

The company believes in the future of new energy, but the only way to succeed is to ensure that the costs of producing high quality electricity are as low as possible.

[mappress]

Advertisement

Offshore WIND Staff, July 18, 2012; Image: The Switch

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.