offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›The Netherlands: Largest Heavy Lift Crane of Europe Operational at Bow Terminal
News

March 30, 2012 · about 14 years ago

The Netherlands: Largest Heavy Lift Crane of Europe Operational at Bow Terminal

Recently, BOW Terminal in Vlissingen, The Netherlands, has invested in the largest fixed heavy lift crane of Europe (Gottwald MK 1500 crane), with 1200 tons lifting capacity. The availability of this permanent heavy lift capacity makes this terminal a perfect location for offshore (wind) and heavy l

1 minutes read
  • LinkedIn
  • X
  • Email

Recently, BOW Terminal in Vlissingen, The Netherlands, has invested in the largest fixed heavy lift crane of Europe (Gottwald MK 1500 crane), with 1200 tons lifting capacity.

The availability of this permanent heavy lift capacity makes this terminal a perfect location for offshore (wind) and heavy lift projects.

BOW Terminal, operational since 2010, is excellently located on the North Sea coast in Vlissingen at the mouth of the Western Scheldt, with direct access to open sea, without any locks or bridges. BOW Terminal has a terminal area of 20 Ha, which is dedicated for offshore wind projects. and a quay length of 340 metres. Additionally, an extra quay length of 1.400 metres is available, equipped with five mobile harbour cranes up for regular cargo, blades and containers. Furthermore, the terminal is equipped with SPMTs, floating cranes, mobile harbour cranes, mafi trailers, flatbed trailers, reachstackers and tug masters.

In 2011/2012, BOW Terminal facilitated the construction of several offshore projects, such as Sheringham Shoal, Lincs, London Array, MORL, Teesside, South Arne and Ekofisk. Additional works on site during these major projects can also be offered inhouse, as well as Port Agency for the vessel owners. Secondary steelworks, supplying of transport saddles for barges, vessels and other relevant activities can be offered on site on 24/7 basis.

[mappress]

Offshore WIND staff, March 30, 2012

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Four Baltica 2 Offshore Substations Set Sail from Vietnam to Poland
  2. 2X1 Wind Closes Strategic Funding Round Ahead of 8.5 MW Floater Deployment
  3. 3RWE, Masdar Team Up for 2027 German Offshore Wind Auctions
  4. 4European Project Completes First Tests of Modular Drivetrain for Offshore Wind Turbines Beyond 15 MW

Daily offshore wind news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free