Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Innogy Nordsee 1 Announces Invitation to Tender for Offshore Wind Inter-Array Cables (Germany)
Contracts & Tenders

February 3, 2012 · about 14 years ago

Innogy Nordsee 1 Announces Invitation to Tender for Offshore Wind Inter-Array Cables (Germany)

Innogy Nordsee 1 GmbH announced request for tender regarding preparation of the design, fabrication and supply of the inter-array cables connecting 54 wind turbine generators and the substation, with an option for the installation works in addition. Innogy Nordsee 1 wind farm is situated approximate

1 minutes read
  • LinkedIn
  • X
  • Email

Innogy Nordsee 1 GmbH announced request for tender regarding preparation of the design, fabrication and supply of the inter-array cables connecting 54 wind turbine generators and the substation, with an option for the installation works in addition.

Innogy Nordsee 1 wind farm is situated approximately 32 km north of the island of Juist, between the traffic separation area Terschelling-German Bight und German Bight Western Approach.

The wind farm design comprises an array of 162 offshore wind turbines with an installed capacity of 6 megawatts each. With a rotor diameter of 126 meters, the 6M is among the largest and most powerful wind energy systems in the world. The rotor consists of three rotor blades of 61.5 meters in length and covers an area greater than that of two football fields, while the turbine house has the dimensions of a semi-detached house. At the Innogy Nordsee 1 wind farm, with an area of around 150 km2, the turbines are built in water which is 26 to 34 meters deep

[mappress] Offshore Wind Staff, February 3, 2012; Image : rwe

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Contracts & TendersGrid Connection

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1US Gov’t Seeks New Review of US Wind’s Maryland Project
  2. 2Former RWE Offshore Wind CEO Joins Esvagt Board
  3. 3UK’s First HVDC Subsea Cable Factory Opens in Scotland
  4. 4Diverse Marine to Build Three More CTVs for OEG

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free