Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›The Netherlands: Jumbo Shipping Winner at 2011 TopLift Competition
News

December 23, 2011 · about 15 years ago

The Netherlands: Jumbo Shipping Winner at 2011 TopLift Competition

The votes have been counted and International Cranes and Specialized Transport magazine revealed the winner and two runners up of its 2011 TopLift competition. Jumbo Offshore was selected winner with its major performance on the Greater Gabbard Offshore Wind Farm project. Readers of International Cr

1 minutes read
  • LinkedIn
  • X
  • Email

The votes have been counted and International Cranes and Specialized Transport magazine revealed the winner and two runners up of its 2011 TopLift competition. Jumbo Offshore was selected winner with its major performance on the Greater Gabbard Offshore Wind Farm project.

Readers of International Cranes and Specialized Transport magazine were asked to choose their favourite lift of the year from our selection of 10 spectacular projects carried out over the last 12 months. It was a close-run contest this year as three entries went head-to-head, with last minute votes separating them by a small margin.

Jumbo Offshore finally took the top spot in the latter stages of the competition. Jumbo installed 131 transition pieces, each weighing up to 300 tonnes, at the Greater Gabbard Offshore Wind Farm. Its DP2 (dynamic positioning) Jumbo Javelin achieved a record-breaking installation speed of more than one a day. It was the first time transition pieces were transported and installed using a free floating vessel on dynamic positioning.

Close behind, in second place, ALE impressed with 1,338 tonne lift and only a small number of votes separated it from third placed equipment user ABF.

[mappress] Offshore Wind Staff, December 23, 2011; Image: jumbo shipping

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PGE and Ørsted Add BGB Group to Baltica 2 Offshore Wind Team
  2. 2Fugro Wins UXO Survey Contract for German Offshore Grid Connections
  3. 3Seaway7 Completes Inter-Array Cable Installation at East Anglia Three Offshore Wind Farm
  4. 4Crewing SOVs and CTVs: Where Wind Operators Will Find Their Next Crews

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free