Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›GEO Carries Out Site Clearance Survey for Jack-up Platform Installation (Sweden)
News

December 15, 2011 · about 15 years ago

GEO Carries Out Site Clearance Survey for Jack-up Platform Installation (Sweden)

In connection with the service of turbines at Lillgrund Offshore Wind Farm, GEO carried out a Site Clearance Survey for a jack-up platform installation. GEO conducted a sidescan sonar survey at two foundations in order to identify objects that could hinder the installation of the jack-up platform. G

1 minutes read
  • LinkedIn
  • X
  • Email

In connection with the service of turbines at Lillgrund Offshore Wind Farm, GEO carried out a Site Clearance Survey for a jack-up platform installation.

GEO conducted a sidescan sonar survey at two foundations in order to identify objects that could hinder the installation of the jack-up platform. GEO was contracted by Siemens Wind Power A/S.

[mappress]

Offshore WIND staff, December 15, 2011; Image: vattenfall

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fugro Wins UXO Survey Contract for German Offshore Grid Connections
  2. 2Seaway7 Completes Inter-Array Cable Installation at East Anglia Three Offshore Wind Farm
  3. 3Crewing SOVs and CTVs: Where Wind Operators Will Find Their Next Crews
  4. 4Prysmian's New Cable-Laying Vessel Performing Sea Trials

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free