  • 4 October 2019

    Bauer Spezialtiefbau has tested onshore piles at the Saint-Brieuc offshore wind project in France to gather data for the design of foundations. Bauer Spezialtiefbau designed, installed and tested a total of 14 drilled and grouted piles at the Routin Quarry near Cap Fréhel, Brittany, under a contract signed with project developer Ailes Marines last year. “The aim was […]

  • 3 July 2020
    Contracts & Tenders

    Van Oord has awarded Bauer Spezialtiefbau with a contract for piling works at the Saint-Brieuc offshore wind project in France. The German company will install 190 bored piles at 62 locations for three-legged jackets, as well as one substation location consisting of a four-legged jacket foundation. Bauer Spezialtiefbau is going the provide and operate the […]

  • 23 February 2015
    R&D

    The annual International Conference on Offshore Wind Substructures was held in Edinburgh last week, where the latest trends in foundation design and innovations in substructure technology were discussed. This two day event facilitated lively discussion among attendees from across the supply chain regarding how foundation engineering may contribute to reducing the levellised cost of energy. […]

  • 26 December 2018
    Business & Finance

    G-Octopus, a Cathie Associates company, is rebranding in order to bring into focus its piling solutions for the renewable energy and oil & gas industries.

  • 30 December 2011

    The two figures of “100 million” and “10 million” are extremely meaningful to each Chinese people. By the end of October, the total installed capacity of China Guodian Corporation surpassed 100 million kilowatts, among which wind power 10 million kilowatts, the symbolic WTG is located at Jiangsu Rudong Offshore (Intertidal) 150,000 kilowatts Large-Scale Demonstration Wind […]

  • 5 June 2020
    Wind Farm Update

    Jan De Nul has kicked off construction works in Taiwan for the 376 MW Formosa 2 offshore wind farm. Nearshore and onshore construction works have started at the landfall site in Miaoli County and Taichung port, Jan De Nul said. Offshore installation works will commence later this year. At the landfall site in Miaoli County, […]

  • 3 July 2020
    Vessels

    A Pile Installation Frame (PIF) for Seaway Yudin’s pin-pile installation work in Taiwan has been loaded onto a vessel in the Port of Rotterdam, from where it will be transported to Taiwan, Seaway 7 said on social media. The company did not name the project for which the PIF is being transported. Seaway 7 has […]

  • 7 June 2017
    Technology, Wind Farm Update

    Norwegian seabed intervention specialist Deep C has been awarded a contract by Seaway Heavy Lifting (SHL) to perform soil plug removal inside subsea piles, as part of the development of the 588MW Beatrice wind farm off Scotland.

  • 3 June 2019

    By Alexandre Crochelet, Senior Engineer at G-Octopus, a Cathie Associates Company Pile Driving Monitoring (PDM) during driving and Pile Dynamic Testing (PDT) are widely used in onshore and offshore construction to ensure the structural integrity of the piles during driving and achieve a safe and economical pile installation. PDM helps in assessing the pile behaviour […]

  • 13 April 2017
    Wind Farm Update

    Construction of the onshore substation for the Beatrice offshore wind farm at Blackhillock, near Keith, is progressing well, according to SSE, which published a video on the latest works being done at the site.

  • 28 September 2015
    R&D

    ECN (Energy research Centre of the Netherlands) has released results of a test campaign that took place in June 2014 in the Bremerhaven where IHC IQIP, together with other industrial parties, measured the behaviour of monopile foundations under different driving methods in onshore conditions. Three piles were driven in the soil by hydraulic hammers of […]

  • 28 April 2020
    Ports & Logistics, Wind Farm Update

    The first pin piles fabricated in South Korea for the Taiwan Power Company Offshore Windfarm Phase 1 Project – Demonstration have been loaded out for transport to Taiwan. As previously reported, Edgen Murray, in collaboration with South Korea’s SeAH, completed the manufacturing of 80 pin piles for the project, also known as Changhua Phase 1, […]

  • 14 July 2015
    R&D, Technology

    The University of Dundee is to lead a major research project to determine whether cheaper, more environmentally friendly, and more effective foundations can be developed for the offshore renewables industry. The project, funded by a £ 1 million grant from the Engineering and Physical Sciences Research Council, will look at the use of screw piles […]

  • 15 May 2018
    Grid Connection

    The jacket foundation for TenneT’s 900MW BorWin3 HVDC platform has been installed in the German North Sea.

  • 29 January 2016
    Business & Finance, Grid Connection, Wind Farm Update

    Heerema Fabrication Group (HFG) has been awarded a contract by Petrofac for the procurement and construction of the jacket and piles for the 900 MW BorWin3 HVDC platform. Petrofac, in a consortium with Siemens, has the full responsibility for the construction and offshore installation of the BorWin3 platform of TenneT, which will house a Siemens HVDC station […]

  • 15 June 2020
    Ports & Logistics, Wind Farm Update

    Hung Hua Construction (HHC) has transported the first batch of twelve pin piles for Taiwan Power Company’s Changhua Phase 1 offshore wind farm from South Korea to Taiwan, following an almost two-month delay in operations due to COVID-19 restrictions. The company, contracted by Jan De Nul for the transport of jacket foundations, loaded the pin […]

  • 6 February 2013
    Wind Farm Update

    FoundOcean has completed the grouting contract for Narec’s Offshore Anemometry Hub (NOAH), under contract to SeaRoc. The NOAH contract was a notable project in another very successful year for FoundOcean which included offshore operations in the United Arab Emirates, South East Asia, Australia, India, the Gulf of Mexico, and Europe, reconfirming their position as the […]

  • 28 April 2017
    Grid Connection, Wind Farm Update

    Construction teams have completed concrete pouring at Blackhillock where the onshore substation is being built for the 588MW Beatrice offshore wind farm project, Beatrice Offshore Windfarm Limited (BOWL) said.

  • 17 April 2020
    Wind Farm Update

    Edgen Murray, in collaboration with South Korea’s SeAH, has completed the manufacturing of 80 pin piles for the Changhua Phase 1 offshore wind project in Taiwan. The project is now entering the final phase with the delivery expected to be completed in May, the Scotland-based company said. Owned by Taiwan Power Company, the 109.2 MW […]

  • 10 May 2019
    Grid Connection

    Siemens has appointed BAM Nuttall as the main contractor to complete the civils work on the onshore substation phase of the Triton Knoll offshore wind farm project, in Lincolnshire. The contract will see BAM Nuttall complete civil and building works including foundations for the transformer, shunt reactor and AIS equipment as well as constructing the […]

  • 30 May 2014

    ITW Polymers Europe manufactures ultrahigh performance grout Ducorit for special purposes such as offshore and onshore wind turbine foundations. At the end of May, the Ducorit grout became a crucial structural component in turbine foundation no. 2000. This is considered a milestone for the Danish wind industry, which in later years has gained an important […]

  • 28 February 2020
    Wind Farm Update

    Offshore piling works have been completed on the Moray East wind farm in the Moray Firth off the North East coast of Scotland, the developers of the 950MW project said. Work to install the pin-piles in the seabed commenced in May of last year, using DEME Offshore’s jack-up installation vessel Apollo which worked out of […]

  • 1 September 2015

    DONG Energy and ESG have tested 28 piles on two different onshore sites in order to assist the development of new design methods for offshore wind farms. Initial results show great cost reduction potential. The testing has been undertaken by the joint industry project PISA and was performed to assess and validate a new design method […]

  • 31 October 2013

    During the quarter Carnegie Wave Energy Limited focused on progressing its Perth Wave Energy Project (the Perth Project) with all key elements of the Project ordered, components being manufactured, and commencement of onshore site works. Highlights from the quarter include: Completed manufacture and delivery of structural foundation piles and installation aids for the Perth Project […]

  • 28 May 2018
    Grid Connection

    The jacket foundation for the 900MW BorWin3 offshore grid platform has been installed in the North Sea, nearly 130 kilometres off the German coast, Petrofac said.

  • 17 January 2020
    Contracts & Tenders

    IHC IQIP has won a contract to provide 84 jacket pile grippers for an offshore wind project in Taiwan. The company did not disclose the name of the project; however, it did say that the jacket pile grippers will be used to install the wind farm’s 21 jacket foundations in 2020. Based on the information […]