Search results for: day

8539 results

A list of search results

  • 24 October 2017

    GE Renewable Energy has published a photo showing its Haliade 150-6MW nacelles for the 396MW Merkur offshore wind farm being assembled at the company’s Saint-Nazaire site in France.

  • 18 October 2017
    Vessels

    Landfall Marine Contractors has posted a photo of their Neptune Mariner during the delivery of one of the monopiles for the 385MW Arkona offshore wind farm in the German Baltic Sea, where they are being installed by Van Oord’s heavy lift installation vessel Svanen.

  • 17 October 2017
    Vessels

    Seazip Offshore Service has posted a photo taken from its service vessel Seazip 3, showing commissioning works at the 336MW Galloper offshore wind farm off the coast of Suffolk.

  • 16 October 2017
    Vessels

    Fred. Olsen Windcarrier’s fleet of seven Bayard class crew transfer vessels (CTVs) reached 1,000 days without a lost time incident (LTI) on 12 October.

  • 10 October 2017

    Sometimes, one can be reading a map only to end up in space, which is not a bad thing at all if that is where they want to go. However, we ought to make sure where we are and which road we need to take to reach our “outer space” goals. Luckily, the second day of the Offshore Wind Conference (OWC) in Amsterdam gathered speakers who can guide us through the offshore wind journey.  

  • 9 October 2017

    The eighth Offshore WIND Conference was opened on Monday, 9 October, by Bent Thambo Jensen, Chief Commercial Officer of Ziton and the Chairman of the first day of the conference. The sessions saw straight-to-the-point statements and some interesting discussions. 

  • 9 October 2017

    For offshore wind to move forward in the most productive way, the industry needs clear targets and stable policy framework for the period ‎from 2020 to 2030, Jasper Vis, Country Manager at DONG Energy Netherlands said at the Offshore WIND Conference in Amsterdam.

  • 5 October 2017
    Vessels

    Osprey Construction and Marine Logistics has posted a photo of the Osprey Carrier II barge entering the Tyne, Newcastle, with the first two jacket top sections for the 92.5MW Aberdeen offshore wind farm on 30 September.

  • 29 September 2017

    The Mukran Port in Sassnitz on the island of Rügen has published a photo of the transition pieces for the 385MW Arkona offshore wind farm.

  • 28 September 2017

    E.ON has posted a photo showing the 400MW Rampion offshore wind farm at sunset off Sussex, UK.

  • 22 September 2017
    Wind Farm Update

    E.ON has posted a photo showing Van Oord’s heavy lift vessel Svanen installing monopile foundations on the 385MW Arkona offshore wind farm in the German Baltic Sea.

  • 14 September 2017

    Those attending HUSUM Wind in Germany might as well start off the event today with an applause as the wind gave quite a performance yesterday, 13 September, forcing the organiser to evacuate four lightweight halls and to ultimately close the fair for the day. Now that the weather is calmer, the event proceeds as planned.

  • 13 September 2017

    Four halls of the HUSUM Wind fair were evacuated today due to strong winds from a storm. The exhibitors and other visitors were asked to leave the lightweight halls 1-4, and gather in hall 5, which is in the main building, Offshore WIND team attending the event reports. 

  • 30 June 2017

    Sif Group has published a photo of its new site at Maasvlakte in Rotterdam accommodating, among others, piles for the Beatrice offshore wind farm foundations and monopiles for the Rentel offshore wind farm.

  • 28 June 2017

    VBMS has published a photo of its cable laying vessels Stemat Spirit and Ndurance working at the Galloper offshore wind farm, while Seajacks Hydra is accommodating the personnel at the wind farm site.

  • 16 June 2017
    Environment, R&D

    A new study by climate scientists has shown that wind farms produce more energy during the coldest spells of the winter compared to milder winter periods.

  • 2 June 2017
    Wind Farm Update

    Beatrice Offshore Windfarm Ltd (BOWL) has shared a photo of the teams at Burntisland Fabrications’ (BiFab) facility in Methil preparing to upend one of the jacket foundations built for the 588MW Beatrice offshore wind farm.

  • 23 May 2017

    Innogy UK yesterday posted the first photo of the first wind turbine installed last week at the Galloper offshore wind farm. 

  • 18 May 2017
    Vessels, Wind Farm Update

    A2SEA’s jack up Sea Installer, together with DONG Energy and Siemens Wind Power, installed the first Siemens 6MW turbine on the 573MW Race Bank wind farm off North Norfolk on 9 May.

  • 9 May 2017
    Wind Farm Update

    Gravity-based foundations that will support the offshore wind turbines at the Tahkoluoto are currently lined up in Pori, Finland, and waiting for the installation vessel Vole au vent, due to arrive by the end of next week.

  • 8 May 2017
    Vessels, Wind Farm Update

    A2SEA’s wind turbine installation vessel Sea Installer left the Port of Hull on Sunday, 7 May, with the first load of wind turbine components for DONG Energy’s 580MW Race Bank offshore wind farm.

  • 11 April 2017
    Operations & Maintenance, Vessels

    Wind Farm Support Vessel (WFSV) MO3, Mainprize Offshore’s latest addition to the fleet, has completed her sea trials in the North Sea and is ready to start her first offshore assignment.

  • 4 April 2017
    Wind Farm Update

    Following the start of construction at the Beatrice offshore wind farm site in the UK, Smulders posted photographs of the upper parts of the jacket foundations the company has been fabricating for the project.

  • 29 March 2017
    Technology, Wind Farm Update

    The first complete nacelle built by Siemens for the 336MW Galloper offshore wind farm underwent its ‘first-click’ test in Esbjerg on Tuesday, 28 March, innogy SE said.

  • 24 March 2017
    Wind Farm Update

    The last four transition pieces (TPs) for the Galloper offshore wind farm in the UK have been dispatched from Smulders facilities in Hoboken, Belgium, and are on their way to Rotterdam, where they will be loaded onto the installation vessel Innovation at Sif’s Maasvlakte 2 site.

  • 16 March 2017
    Vessels, Wind Farm Update

    Fred. Olsen Windcarrier has shared a photo of its wind turbine installation vessel Brave Tern hard at work transporting and installing wind turbine components at Iberdrola’s 350MW Wikinger offshore wind farm in the German part of the Baltic Sea.