Search results for: blue

619 results

A list of search results

  • 14 February 2013

    The Blue Ocean Projects (BOP) range of Cable Protectors is designed to provide protection for subsea cables or pipes at offshore wind or tidal energy foundations, in shallow water and at landfalls, boulder fields or areas of rocky seabed where cable burial is impractical. In this video Blue Ocean Projects demonstrates installation of Blue Ocean […]

  • 18 March 2020
    R&D, Technology

    After being fully assembled onshore, the scaled-down version of the BlueSATH floating wind turbine prototype has been lowered into water, Saitec Offshore Technologies said. The BlueSATH (Swinging Around Twin Hull) prototype is now ready to be transported to the installation site off Santander, Spain. Following the installation, this 1:6 version of the BlueSATH turbine will […]

  • 29 October 2012

    On the 17th and 18th October Niels Tolstrup and Jacob Kjærgaard from Blue Water Shipping visited Belfast office and inspected the finished D1 area that is to be used for the handling and shipping of foundations and turbines for the West of Duddon Sands offshore wind project in the Irish Sea. “D1 was handed over […]

  • 15 September 2014
    Business & Finance

    The large jack-up vessel Thor sailed from the North Sea to the Danish city Hirtshals in the beginning of September to be prepared for the ships next assignment in the Baltic Sea. During the stay, Blue Water acted as agent for the ship. “We have wide experience within port agency services and other harbor-related assignments, […]

  • 1 June 2010

    With the establishment of Blue Offshore a specialist marine engineering contractor has entered the subsea cable installation market with the focus on the development of the world’s wind and tidal potential. Blue Offshore will initially provide subsea cable installation services for offshore wind farms. They will assist their customers with innovative standalone and module-based solutions […]

  • 20 November 2017
    Business & Finance, Jobs & Recruitment

    Lars Blicher, CEO and Director at Swire Blue Ocean, resigned from the position on 16 November.

  • 2 July 2012

    1 January 2011, transport and logistics company Blue Water Shipping acquired ship broking company Oestship in Grenaa on the east coast of Jutland in Denmark. Since then, Oestship has been a part of Blue Water Shipping under its own name. As from 1 July 2012, this has changed, with the office officially changing its name […]

  • 5 August 2013

    At the end of July, the „INNOVATION“ arrived at the Orange Blue Terminal in Eemshaven. This was not the first assignment at the Dutch offshore terminal for the modern heavy lift jack-up vessel from HGO InfraSea Solutions, which installs foundations at the Global Tech I wind park for HOCHTIEF Solutions. However, its premier jack-up occurred […]

  • 13 February 2018
    Business & Finance

    Swire Blue Ocean has appointed Mikkel Gleerup as Chief Executive Officer (CEO).

  • 2 April 2014
    Operations & Maintenance

    During the first quarter of 2014, Blue Water has supported Swire Blue Ocean with port services for the Windfarm Installation Vessel (WIV) “Pacific Osprey” in the Port of Liverpool. The vessel has been working at wind farms Walney, Burbo Bank and Rhyl flats in the Irish Sea and Blue Water has had a chance to […]

  • 31 August 2011

      A brand new UK logistics company has been launched specifically designed to meet the needs of the renewable industry sector, combining over 30 years experience. The new company -Blue Water Danbrit Shipping Limited- is based on the Humber. The company combines the well established, UK logistical expertise of Danbrit Shipping Ltd with that of […]

  • 29 June 2017
    Wind Farm Update

    The Buss Orange Blue Terminal signed a contract with offshore wind farm constructor GeoSea N.V. for the handling and storage of the transition pieces for the fundamental structures of the 396MW Merkur offshore wind farm.

  • 29 June 2016
    Grid Connection, Vessels, Wind Farm Update

    Blue Water Shipping and A2SEA have completed the loading, transportation and installation of three transformer units at the 400MW Horns Rev 3 offshore wind farm in the Danish part of the North Sea. Blue Water loaded the three transformer units onto A2SEA’s installation vessel, Sea Installer, in the Port of Esbjerg last week. The units had […]

  • 8 August 2013
    Business & Finance

    Blue Water loaded the last component from the Port of Esbjerg to the German wind farm Riffgat Offshore Wind Farm which is located in the North Sea. The turbines were installed by the experienced Norwegian company Fred. Olsen Windcarrier, who looks back on a positive project. “The cooperation with Blue Water has been excellent and […]

  • 13 October 2015

    Blue Water France was invited to participate in a panel discussion at MRE (Marine Renewable Energy) conference in Le Havre. The topic of discussion was: Are the port and logistics operators ready? Blue Water gave input on the challenges ahead and complimented the ports for the investments already made. It is the first time that […]

  • 28 September 2012

    Blue Water Shipping has just celebrated its 40th anniversary – founder and Managing Director Kurt Skov at the helm throughout all the years – and is now ready to put a new man in front of the company. 46-year-old Kim Hedegaard Sørensen is appointed new Managing Director for Blue Water Shipping – Denmark’s most versatile […]

  • 15 March 2013
    Technology

    Oceanlinx today unveiled the highly optimised blueWAVE design that is a smaller, lighter and a cheaper wave energy solution for deep water applications. Oceanlinx’s continued development and expertise in the wave energy sector has allowed the company to further improve the blueWAVE design to ensure even better performance and also a reduction in overall costs. […]

  • 19 March 2020
    Business & Finance

    Total and Simply Blue Energy have established a partnership to develop floating offshore wind projects in the Welsh waters of the Celtic Sea. The newly established joint venture, Blue Gem Wind, will focus on developing some of the first floating offshore wind projects with pre-commercial size, Green Giraffe, Simply Blue Energy’s sole financial advisor for […]

  • 28 September 2012
    Business & Finance

    Hogan Lovells advised the bank lenders to the Blue Transmission consortium of Macquarie Capital Group Limited and Barclays Integrated Infrastructure Fund on the consortium’s successful bid to acquire and operate the transmission link to the Walney 2 offshore wind farm for £110 million. The lending group comprised Lloyds Banking Group, SMBC, Bank of Tokyo Mitsubishi, […]

  • 27 June 2017
    R&D

    Blue Abyss, the world’s first commercial space and deep sea centre, will be developed at Royal Air Force (RAF) base site in Bedfordshire.

  • 29 May 2012

    Blue Water Shipping has partnered with Michael F. Ewings Shipping in relation to port agency and marine-related activities in Belfast, Northern Ireland.  “With its new quay facilities, I have no doubt that Belfast Port will become an important location to the offshore wind industry in relation to future projects in e.g. the Irish Sea. This […]

  • 28 May 2014
    Operations & Maintenance

    Earlier this year, Blue Water shipped and handled a crane upgrade for A2SEA’s offshore installation vessel, “SEA INSTALLER”. “Project specialists from Shanghai, Singapore and Esbjerg have handled a major component for the crane upgrade – an A-frame weighing 144 ton and measuring approx. 3000 x 1400 x 900 cm. The large component was loaded on […]

  • 10 February 2012

    Blue Water Shipping has just finished a promotion tour in France – focusing on the development of French offshore wind. Blue Water Shipping spent a week visiting several French ports which potentially are going to play a role in future French offshore wind projects. Blue Water Shipping was represented by Søren Stougaard and Jacob Kjærgaard […]

  • 26 May 2014
    Technology

    Blue Offshore has built its second basket carousel  for subsea cable installation.  Blue Offshore’s cable storage and installation system includes a modular basket carousel, a loading tower and loading arm, a 10 tonnes tower tensioner, a 10 tonnes aft deck tensioner, chute, roller guides and control cabin. Our System provides an increased choice in fit-for-purpose […]

  • 27 January 2017
    Technology

    The first segments for the BLUE Hammer by Fistuca BV, which Sif is manufacturing in collaboration with Huisman, are ready at Sif’s Maasvlakte 2 facility. The hammer will be the world’s largest pile-driver hammer, being specially designed to drive the largest monopiles in the world. BLUE Piling Technology is an alternative to current pile-driving technology […]

  • 20 December 2017
    Business & Finance

    Esvagt CEO Søren Nørgaard Thomsen has left the company to become the CEO of Blue Water Shipping, where he will replace the company’s founder and CEO Kurt Skov.