Search results for: VindØ

27815 results

A list of search results

  • 22 May 2020
    Business & Finance

    A consortium comprising PensionDanmark, PFA and SEAS-NVE said it was ready to finance the VindØ energy island in the North Sea. The consortium would initially contribute with up to DKK 400 million (EUR 53.6 million) to develop the project. Copenhagen Infrastructure Partners, an investment company behind several offshore wind projects worldwide, will provide assistance to […]

  • 10 January 2017
    Contracts & Tenders, Wind Farm Update

    Siemens has chosen the Navantia-Windar joint venture for the supply of three-legged jacket foundations and accompanying piles for four 7MW offshore wind turbines to be installed as part of the Nissum Bredning Vind demo project in Denmark. The Spanish companies will carry out the project in parallel to the construction of 42 jackets for East Anglia One at […]

  • 2 September 2011

    MMT and NetSurvey are participating in two different events this September. The first event is The 9th European Wave and Tidal Energy Conference Series (EWTEC) that takes place September 5th – 9th at the University of Southampton. EWTEC is an international, technical and scientific conference that focuses on ocean renewable energies. This conference is widely […]

  • 20 September 2016
    Wind Farm Update

    Nissum Bredning Vindmøllelaug and Jysk Energi, which placed the winning bid for Nissum Bredning Vind project earlier this year, following a call for tender from Danish Energy Agency’s (DEA), have made the final investment decision for the 28MW pilot project in northern Denmark. The commercial aspect of the offshore wind technology to be tested in the project […]

  • 22 June 2017
    Wind Farm Update

    Svea Vind Offshore, a recently established Swedish company, plans to build six new wind farms off the coasts of Gävle and Oxelösund in Sweden.

  • 28 March 2012

    At a meeting of the Board of Directors of DONG Energy A/S on 9 March 2012, the Board decided to ask the law firm Norrbom Vinding to conduct a legal investigation to assess whether, in connection with the establishment of salary and employment terms for specific existing and former employees, Anders Eldrup, in his capacity […]

  • 11 June 2013

    GEO is presently carrying out engineering consultancy for E.ON Vind Sverige AB regarding the installation of ’MPI Discovery’ jack-up vessel at Kårehamn wind farm. The 6 legs vessel, 140 m long and 40 m wide, will be installing the wind turbines over the gravity foundations already present. As the seabed is full of boulders and […]

  • 16 August 2011
    Business & Finance

    DONG Energy has sold its 50 per cent stake in Nordkraft Vind to Nordkraft Produksjon for NOK 145 million (DKK 138 million). The size of DONG Energy’s portfolio of wind projects in Norway is found no longer to warrant a continued strategic focus on expansion of the Norwegian market. Nordkraft Vind operates the Nygårdsfjellet 1 […]

  • 16 April 2013

    MMT (Sweden) has just completed a site clearance survey in connection to the planned Kårehamn wind farm. E.ON Vind Sverige AB contracted MMT for a Site Clearance Survey at the new Kårehamn wind farm outside the island of Öland. MMT conducted a geophysical survey followed by target an inspection, using ROV around each of the […]

  • 6 October 2017
    Vessels, Wind Farm Update

    Aarsleff has completed the production and outfitting of the four transition pieces for the 28MW Nissum Bredning offshore wind farm in Denmark. The structures are now on their way to Thyborøn onboard the barge Aarsleff 132.

  • 18 April 2013
    R&D, Technology

    The two next-generation Siemens 6MW offshore wind turbines at the Gunfleet Sands demonstration project in the UK have produced the first power. DONG Energy will use Siemens 6MW wind turbines commercially for the first time at Westermost Rough off the Yorkshire coast in the United Kingdom and has recently entered an agreement with Siemens to […]

  • 19 June 2018
    Business & Finance, Operations & Maintenance, R&D, Technology, Wind Farm Update

    Some of the innovative elements introduced on the 28MW Nissum Bredning Vind offshore demonstrator site in Denmark have led to cost reductions of up to 30% compared to traditional elements, Siemens Gamesa said.

  • 8 February 2018
    Grid Connection, Wind Farm Update

    The fourth and final Siemens Gamesa 7MW wind turbine was installed at the Nissum Bredning site in January, with cabling works now well underway and expected to be completed soon, according to the project’s social media page. 

  • 18 August 2017
    Wind Farm Update

    Spain’s Navantia-Windar consortium has loaded the first two out of four jacket foundations built for the 28MW Nissum Bredning demonstration offshore wind project at Navantia’s facility in Fene. 

  • 29 August 2017
    Grid Connection, Wind Farm Update

    JD-Contractor, a danish subsea specialist, has won the contract for the cabling of the 28MW Nissum Bredning test and development wind farm off Denmark where Siemens Gamesa plans to utilise a range of new offshore wind solutions.

  • 6 September 2017
    Wind Farm Update

    Siemens Gamesa Renewable Energy has awarded the Manchester company Granada Material Handling Ltd with a davit crane contract for the 28MW Nissum Bredning offshore wind farm off Denmark.

  • 12 June 2017
    Vessels, Wind Farm Update

    MHI Vestas Offshore Wind has chartered United Wind Logistics’ specialized vessel Vestvind to transport the V164-8.0 MW turbine components. The Vestvind has already started delivering turbine components to Belfast for the Walney Extension wind farm in the Irish Sea. “This is yet another milestone for our company, we’re very proud to partner with United Wind Logistics in the […]

  • 24 April 2018
    Technology, Wind Farm Update

    Siemens has supplied four panels of the 8VM1 gas-insulated SF6-free high-voltage switchgear (GIS) to Siemens Gamesa Renewable Energy.

  • 17 April 2014
    Operations & Maintenance, Technology

    Gamesa, a global technology leader in wind energy, has developed a pioneering system for the prevention of ice formation on wind turbine blades. This solution, called Bladeshield, consists of an anti-icing ‘paint’ which not only prevents the formation of ice but also boosts the paint’s resistance to erosion, instead of reducing it as other solutions […]

  • 22 August 2012
    Business & Finance

    The second quarter of 2012 was characterised by low electricity prices in the Nordic region, but a significant portfolio of long-term power contracts and high production still ensured that the Group achieved satisfactory results. Underlying EBITDA and the pre-tax result were higher than in the same period last year. In the second quarter of 2012, […]

  • 29 August 2013
    R&D, Technology

    Fistuca has announced that it had finished a series of successful near-shore piling tests with a 2.2m prototype. Two piles have been driven, a Ø2.2 meter open-ended pile and a Ø0.7 meter closed-ended pile. Extensive measurements of underwater sound levels and pile driving properties have been performed. The company collaborated with Van Oord Offshore Wind […]

  • 5 January 2012

    Formaco has delivered two 17-ton steel rings produced in Italy to a customer in the Dutch offshore industry. These parts are for a lifting tool that lifts 800 tons and 60 meters long tubes. The rings with diameter of Ø3,5 meters, height of 900 mm were forged from solid 25 tons blocks of steel. The […]

  • 30 July 2014

    Euskalforging has won a contract to supply 48 Ø 5.000mm MP flanges for the Dutch Westermeerwind offshore wind park. Euskalforging confirms its technical leadership as the flanges are manufactured in a particular steel grade that incorporates a specific chemical analysis that facilitates the weldability together with higher mechanical properties. Detailed information at that stage is kept […]

  • 15 May 2012

    There is an increasing demand for larger, heavier and thicker bended plates and profiles. Kersten Europe aims to respond as effectively as possible to demands from the market. For this reason, Kersten Europe recently invested in two brand new machines in order to be able to bend even larger and thicker plates. Lately, the machine […]

  • 11 May 2020
    Industry Contribution

    By Steelwind Nordenham. XXL-Monopiles have been successfully used for water depths of up to 40 metres. Now wind farm developers need monopiles “beyond XXL”. Evolution “At the beginning of this decade nobody could image that 10 MW turbines and XXL-monopiles will be state of the art in offshore wind foundations and now we are even […]

  • 28 March 2011
    Business & Finance

    A consortium consisting of PensionDanmark and PKA has signed an agreement with DONG Energy on the acquisition of 50 per cent of the Anholt offshore wind farm for a price of app. DKK 6 billion. PensionDanmark is lead investor in the consortium and will acquire a 30 per cent interest, while PKA will acquire a […]