Search results for: VOS Sympathy

450 results

A list of search results

  • 21 June 2016
    Vessels

    Vroon’s new DP2 subsea-support walk-to-work (W2W) vessel, VOS Stone, was launched last weekend at Fujian Southeast Shipbuilding Co. Ltd. in China. VOS Stone, as well as her sister vessel VOS Start, can carry a total of 87 persons, offering accommodation and work space for up to 60 personnel. The vessels can be fitted with a W2W system […]

  • 17 November 2014
    Grid Connection, Technology

    Vos Prodect Innovations has secured a new order from Norddeutsche Seekabelwerke GmbH (NSW), for the design and supply of cable hang-off systems for an offshore wind farm project, located in the United Kingdom. With this project, Vos Prodect Innovations, market leading cable hang-off system supplier is to achieve delivery of 1.000th system around second quarter […]

  • 18 April 2018
    Business & Finance, Operations & Maintenance, Vessels

    The MPI Workboats activities will be transferred to Vroon Offshore Services (VOS) with effect from 1 May 2018, with the MPI Workboats’ personnel transitioning to VOS.

  • 24 July 2019
    Vessels

    Vroon’s walk-to-work vessel VOS Start has arrived at IJmuiden, the Netherlands, after completing a two-year charter for MHI Vestas. VOS Start began work for MHI Vestas in August 2017 at the Walney Extension wind farm in the Irish Sea, after which it supported the commissioning phase of the Borkum Riffgrund 2 project in Germany last spring. Most […]

  • 11 September 2012

    Following the variation order for the supply of sealed hang-off systems for an offshore wind farm project in the North Sea, in order to validate the functionality of the sealing concept, Vos Prodect Innovations has performed a real life sealing test with a piece of yarned submarine cable positioned in the cable hang-off system. The […]

  • 21 June 2013
    Business & Finance, Technology

    ABB AB has appointed Vos Prodect Innovations as preferred supplier for engineering, testing and supply of cable hang-off systems for the RWE’s 48- turbine Nordsee Ost (NSO) offshore wind farm in the German North Sea region. Vos Prodect cable hang-off systems will be used to provide flexibility in cable laying and securing operations with the […]

  • 10 October 2017
    Vessels, Wind Farm Update

    VBMS has awarded Vroon’s subsea-support walk-to-work vessel VOS Stone a contract to support inter-array cabling operations at the 385MW Arkona offshore wind farm from spring 2018.

  • 21 April 2017
    Vessels, Wind Farm Update

    Vroon Offshore Service’s platform supply vessel (PSV) VOS Prelude has joined MPI Offshore’s wind turbine installation vessel (WTIV) MPI Discovery and another Vroon’s PSV, VOS Prime, on the 400MW Rampion offshore wind project off the south coast of England.

  • 14 September 2016
    Vessels

    MHI Vestas Offshore Wind has signed a contract with Vroon Offshore Services for the supply of offshore logistics support, accommodation and walk-to-work services during construction of DONG Energy’s Walney Extension West offshore wind project. Vroon will deploy its newbuilding subsea-support vessel VOS Start, which provides accommodation and work space for up to 60 client personnel. The […]

  • 15 March 2016
    Vessels

    Vroon’s DP2 subsea-support walk-to-work (W2W) vessel, VOS Start, was launched last week at Fujian Southeast Shipbuilding Co. Ltd. in China, and earlier this week, the keel was laid for its sister vessel, VOS Stone. Both vessels can carry a total of 87 persons, offering accommodation and work space for up to 60 client personnel. The new design […]

  • 18 January 2018
    Vessels

    Damen Shiprepair Oranjewerf has completed final outfitting and modifications on a second subsea-support walk-to-work (W2W) vessel for Vroon Offshore Services – VOS Stone.

  • 29 May 2012

    In addition to the successfull realization of its cable hang-off system, Vos Prodect Innovations is looking for additional features to satisfy the new requirements of the offshore wind farm projects. Project developers are setting additional firm requirements that have to be met and relevant systems have to be qualified with product tests. The latest requirement […]

  • 4 June 2012

    Vos Prodect Innovations is going to be represented at Renewable UK’s 11th annual Global Offshore Wind event which will be held on 13th – 14th of June 2012, in London. Global Offshore Wind is a dedicated event to share ideas, network, make global connections and do business with sector leaders. In addition to the well-known […]

  • 15 September 2015
    Grid Connection

    Vos Prodect Innovations has been awarded a contract by Norddeutsche Seekabelwerke GmbH (NSW), regarding the design and supply of sealed cable hang-off systems for an offshore wind farm project, located in the German North Sea. For this project, Vos Prodect will supply the next generation of the cable hang-off system which is fully comply with the […]

  • 7 October 2011

      Vos Prodect Innovations is going to be represented at the Renewable UK annual event, which will be held between 25th – 27th of September 2011, in Manchester. With 5000+ delegates, Renewable UK 2011 annual conference and exhibition is the UK’s premier energy event. Therefore, it’s a great opportunity to extend the business and keep […]

  • 29 June 2016
    Vessels

    Subsea-support vessel (SSV) VOS Star was christened on 27 June in Dordrecht, the Netherlands. The vessel was named by Mrs Lianne Maandag, wife of Evert Maandag, Vroon Head QHSE. VOS Star is a DP2, SPS-coded, 68-metre vessel and one of two newbuilding SSVs to have been constructed at Fujian Southeast Shipbuilding in China. After arriving […]

  • 9 March 2015
    Business & Finance, Wind Farm Update

    Van Oord has awarded Vos Prodect Innovations with a contract for the design and supply of cable protection systems for the Gemini offshore wind project. This is the first project where Vos Prodect will utilize its recently developed Monopile Entry System (Pro-MES). The Pro-MES system will be installed into the J-tubeless foundations of Gemini offshore […]

  • 10 November 2011
    Grid Connection

    Vos Prodect Innovations B.V. has been awarded an order by Norddeutsche Seekabelwerke GmbH (NSW), for the supply of Cable Hang-off Systems for an offshore wind farm project in the North Sea. Vos Prodect has carried an intensive development program to launch the best system to meet the technical & commercial requirements of NSW for the […]

  • 26 August 2015
    Grid Connection, Wind Farm Update

    The first two Vos Prodect’s monopile entry systems (Pro-MES) have been installed by Van Oord, at Gemini offshore wind farm project by the end of week 32. Pull-in of both first end and second end of the cable were completed on schedule and without any problems. Pro-MES systems have been tailored to the specific requirements […]

  • 11 November 2019
    Vessels

    Vroon’s walk-to-work vessel VOS Start has begun operating at the Northwester 2 offshore wind project in Belgium. For the charter, VOS Start has been fitted with a three-dimensional motion-compensation system (3D Tip), with a lifting capacity of up to 5t. All operations are being conducted from the port of Ostend, with the vessel on duty […]

  • 19 October 2016
    Business & Finance, Operations & Maintenance, Technology, Vessels

    Vroon will equip its new walk-to-work vessel VOS Start with a Barge Master Gangway. The Barge Master Gangway incorporates an access tower with an elevator, providing step-less access. The adjustable pedestal provides full flexibility in landing heights, Vroon said. “During the development of the gangway we worked closely together with Vroon,” said Martijn Koppert, CEO of Barge […]

  • 21 January 2014

    Yesterday morning, while undertaking a routine cargo run into Great Yarmouth, the VOS Discovery responded to a distress call. The distress call came from the Norfolk Tern, a wind farm workboat, which had suffered a fire on-board. Although the fire had been successfully extinguished by the Norfolk Tern crew members, one of them was suffering […]

  • 2 August 2017
    Operations & Maintenance, Vessels, Wind Farm Update

    Vroon Offshore Services and Rhenus Offshore Logistics B.V. have been working together on a maintenance campaign at two offshore substations on the 600MW Gemini offshore wind farm in the Dutch North Sea.

  • 5 June 2014
    Grid Connection, Technology

    Vos Prodect Innovations will be exhibiting at the Global Offshore Wind 2014, which will be held between 11-12 June, in Glasgow.   Vos Prodect will be showcasing its newest development, “Monopile Cable Entry System” for the protection of offshore wind farm inter array cables at stand 33. Over the last year engineering, development and test program […]

  • 27 June 2016

    Vos Prodect has performed an endurance test with a 155kV HVAC cable, clamped in a temporary hang-off section as part of a recently awarded contract with Siem Offshore Contractors. The company has been contracted by Siem Offshore Contractors for testing and delivery of sealed cable hang-off systems for two 155kV HVAC cables between two offshore substations in German waters. […]

  • 15 January 2013
    Grid Connection

    Vos Prodect Innovations secures a new contract from Cofely Fabricom sa/nv, for the supply of sealed cable hang-off systems of E.ON’s Amrumbank OWF. The Amrumbank West offshore wind farm is located around 35 km north of the island of Helgoland. It will consist of 80 Siemens wind turbines with a rated output of 3.6 MW […]