Search results for: Transition pieces

2991 results

A list of search results

22 September 2017 Contracts & Tenders, Wind Farm Update

Along with its call for monopile maufacturers to pre-qualify for the tender for three Danish offshore wind projects, Vattenfall issued a pre-qualification call for the supply of transition pieces. 

11 April 2017 Wind Farm Update

The Hornsea Project One offshore substation Z13 arrived at Bladt Industries’ site in Aalborg last week, the company informed via social media, where it also published a photo of the first load out of its share of the Walney Extension transition pieces.

19 June 2017 Wind Farm Update

GeoSea has awarded Sif the production of all monopiles and, in joint venture with Smulders, all the transition pieces for the EnBW Albatros offshore wind farm in Germany.

5 November 2013 Wind Farm Update

[…]

26 October 2017 Wind Farm Update

Bladt Industries has shipped the remaining five transition pieces (TPs) for the Arkona offshore wind farm from the Port of Aalborg to Sassnitz, Germany.

13 September 2017 Grid Connection, Wind Farm Update

Bladt Industries has installed a helideck on the first out of the three substation topsides currently under construction for DONG Energy’s 1.2GW Hornsea Project One offshore wind farm in the UK.

5 March 2018 Ports & Logistics, Vessels, Wind Farm Update

Jan De Nul’s wind turbine installation vessel Vole au vent has left the port of Eemshaven loaded with the first set of monopiles and transition pieces to be installed on the 450MW Borkum Riffgrund 2 wind farm in the German North Sea.

23 October 2017 Wind Farm Update

The first two transition pieces (TPs) were put on top of the two already installed jackets at the Nissum Bredning site. The first one got together with its jacket on Wednesday, 18 October, and the second one was installed on Sunday.

16 July 2018 Vessels, Wind Farm Update

BigLift’s cargo ship Happy Star brought the first eleven transition pieces for the Deutsche Bucht (DeBu) offshore wind farm to the Cuxhaven port in Germany on 14 July, after loading them three days earlier in the Port of Avilés, Asturias, Spain.

21 October 2012 Wind Farm Update

[…]

10 March 2015 Business & Finance

[…]

28 September 2017 Wind Farm Update

DONG Energy has appointed Con4Mare as the marine warranty surveyor for the transport and installation of the transition pieces and monopile foundations at the 1.2GW Hornsea Project ONE offshore wind farm.

25 July 2017 Vessels, Wind Farm Update

After installing the first four monopiles and transition pieces at the Rentel offshore wind farm site in Belgium, GeoSea’s wind farm installation vessel Innovation is returning to the Port of Rotterdam to load further three monopiles and TPs today, 25 July. 

3 July 2017 Wind Farm Update

The first of forty-two transition pieces to be built by Navantia for Iberdrola’s 714MW East Anglia ONE offshore wind farm is ready for a paint job.

26 February 2018 Operations & Maintenance, Ports & Logistics, Vessels, Wind Farm Update

Belfast Harbour has published a photo showing the heavy lift vessel Happy River arriving at the port with 12 transition pieces for the 714WM East Anglia ONE offshore wind farm.

23 February 2016

[…]

5 December 2017 Wind Farm Update

Nissum Brednings Vindmøllelaug has completed the installation of the first Siemens 7MW direct drive wind turbine at the Nissum Bredning demonstration site in Denmark.

13 June 2017 Wind Farm Update

Seaway Heavy Lifting has awarded Sif Holding, in a joint venture with Smulders, a contract for production of all monopiles and transition pieces for the Trianel Windpark Borkum II (TWB II) offshore wind farm.