Search results for: Transition pieces

628 results

A list of search results

5 December 2018 Business & Finance, Operations & Maintenance

ALE has designed a new modular transport frame for carrying transition pieces within marshaling ports, which is said to optimize the costs of offshore wind projects.

24 October 2018 Business & Finance, Contracts & Tenders, Jobs & Recruitment, Wind Farm Update

UK-based EEW OSB has secured a contract to provide 35 transition pieces for Ørsted’s Borssele 1 + 2 offshore wind farm in the Dutch North Sea.

17 October 2018 Ports & Logistics, Wind Farm Update

Bladt Industries has shipped off the last four transition pieces built for Vattenfall’s Horns Rev 3 offshore wind farm.

27 September 2018 Operations & Maintenance

Heavy lift equipment specialist Enerpac has supplied GeoSea Geotechnical & Offshore Solutions with an integrated trolley system for loading transition pieces destined for the Hohe See and Albatros offshore wind farms onto a jack-up vessel.

3 September 2018 Ports & Logistics, Vessels, Wind Farm Update

The jack-up vessel Seajacks Scylla has left Cuxhaven loaded with the first three monopiles and transition pieces to be installed on the 269MW Deutsche Bucht wind farm in the German North Sea.

20 August 2018 Contracts & Tenders, Operations & Maintenance

The Thailand-based oil & gas company CUEL Limited has secured a contract with Jan De Nul for the fabrication and supply of 20 transition pieces for the Formosa 1 Phase 2 project in Taiwan, marking its first offshore wind contract.

16 July 2018 Vessels, Wind Farm Update

BigLift’s cargo ship Happy Star brought the first eleven transition pieces for the Deutsche Bucht (DeBu) offshore wind farm to the Cuxhaven port in Germany on 14 July, after loading them three days earlier in the Port of Avilés, Asturias, Spain.

10 July 2018 Ports & Logistics, Wind Farm Update

Jan De Nul’s jack-up Vole au vent has arrived in Vlissingen, the Netherlands, to load the first set of transition pieces and install them on Vattenfall’s Horns Rev 3 wind farm in the Dutch North Sea.

6 July 2018 Vessels

Van Oord has ordered lifting slings from Cortland, a global ropes and slings specialist, for the installation of monopiles and transition pieces at the Norther offshore wind farm in Belgium and Deutsche Bucht offshore wind farm in Germany.

6 July 2018 Business & Finance, Contracts & Tenders, Wind Farm Update

Bladt Industries has signed two contracts with Jan de Nul and Parkwind, under which the foundation manufacturer will deliver 23 monopiles and transition pieces for Northwester 2 wind turbines, and one monopile and transition piece for the project’s substation.

18 April 2018 Contracts & Tenders, Ports & Logistics, Wind Farm Update

The Buss Orange Blue Terminal Eemshaven has signed a contract with GeoSea for port logistics services of 87 monopiles and transition pieces for the 497MW Hohe See and the 112MW Albatros offshore wind farms in the German North Sea.

13 April 2018 Contracts & Tenders, Wind Farm Update

Bladt Industries has contracted a partnership of BIC Electric and Resolux to take part in the outfitting of 124 transition pieces built for Ørsted’s 1.2GW Hornsea Project One offshore wind farm.

12 April 2018 Ports & Logistics, Vessels, Wind Farm Update

Offshore wind installation vessel Pacific Osprey is loading the first monopiles and transition pieces for the 497MW EnBW Hohe See offshore wind farm at the Port of Vlissingen in the Netherlands.

29 March 2018 Vessels, Wind Farm Update

The last eight transition pieces (TPs) for the Merkur offshore wind farm have been loaded onto the RollDock Sea vessel and are now ready to sail out to Eemshaven, according to Roll Group’s social media pages. 

7 March 2018 Operations & Maintenance, Vessels, Wind Farm Update

Manora Logistics has started transporting the transition pieces for the 497MW Hohe See offshore wind farm from Antwerp, Belgium, to SIF’s terminal at Maasvlakte, the Netherlands.

5 March 2018 Ports & Logistics, Vessels, Wind Farm Update

Jan De Nul’s wind turbine installation vessel Vole au vent has left the port of Eemshaven loaded with the first set of monopiles and transition pieces to be installed on the 450MW Borkum Riffgrund 2 wind farm in the German North Sea.

2 March 2018 Business & Finance, Wind Farm Update

Bladt Industries started the delivery of Hornsea Project One transition pieces (TPs) and anode cages last week by loading the first six TPs and anode cages onto SAL Heavy Lift’s vessel at Bladt’s facilities in Aalborg, Denmark. 

15 February 2018 Operations & Maintenance, Ports & Logistics, Wind Farm Update

RollDock is currently transporting the transition pieces (TPs) for the Merkur offshore wind farm from Aviles, Spain, to the Buss Orange Blue Terminal in the Eemshaven port, the Netherlands.

18 January 2018 Operations & Maintenance, R&D, Vessels

ELA Container Offshore has recently delivered two ELA Offshore Living Quarters for Jumbo Offshore’s Heavy Lift Crane Vessel (HLCV) MV Fairplayer, which worked on the transportation and installation of transition pieces (TPs) for the Arkona offshore wind farm.

28 December 2017 Wind Farm Update

The photo, shared by E.ON, is showing some of the 60 transition pieces waiting in the Mukran Port in Sassnitz to be installed on the Arkona offshore wind farm.

21 December 2017 Wind Farm Update

The second Siemens 7MW wind turbine was installed at the Nissum Bredning site on 17 December, with all the transition pieces now placed on their corresponding gravity jacket foundations.

4 December 2017 Vessels, Wind Farm Update

Jumbo’s Heavy Lift Crane Vessel (HLCV) Fairplayer is now installing transition pieces (TPs) at the Arkona offshore wind farm. The vessel was outfitted with an SMST gangway shortly before the works started in early November, according to SMST.

28 November 2017 Business & Finance, Contracts & Tenders, Wind Farm Update

Danish offshore wind developer Ørsted has contracted the Teesside-based EEW OSB (formerly OSB) and Denmark’s Bladt Industries to manufacture 30 and 28 transition pieces respectively for the 174-turbine Hornsea Project One.

24 November 2017 Wind Farm Update

Offshore Structures Britain (OSB) has installed the first external platform on one of the transition pieces being built for the Hornsea Project One offshore wind farm in the UK part of North Sea.

23 November 2017 Ports & Logistics, R&D, Wind Farm Update

Sif has started the production of monopile foundations and has produced half of the primary steel for the transition pieces (TPs) to be installed on the 370MW Norther offshore wind farm located in the Belgian North Sea.

9 November 2017 Wind Farm Update

The installation of monopiles at the Arkona offshore wind farm site has been completed ahead of schedule with the last of the total of 60 monopiles now in place, allowing for an early start of the installation of the transition pieces.