Search results for: Ten Noorden van de Waddeneilanden

20643 results

A list of search results

  • 25 February 2019
    Contracts & Tenders, R&D

    DNV GL Denmark A/S has won a contract to provide the certification of site studies for the Hollandse Kust (west) and Ten Noorden van de Waddeneilanden wind farm zones in the Dutch North Sea. The contracting authority, the Ministry of Economic Affairs and Climate, the Netherlands Enterprise Agency (RVO.nl), plans to conclude a contract for the certification […]

  • 26 February 2019
    Contracts & Tenders, Wind Farm Update

    Fugro Netherlands Marine B.V. has won a contract to provide meteorological and oceanographic data for the Hollandse Kust (west) and Ten Noorden van de Waddeneilanden wind zones in the Dutch North Sea. The field data will be obtained by means of two individual systems equipped with a LiDAR system to measure wind properties and dedicated instrumentation […]

  • 24 July 2018
    Wind Farm Update

    The Netherlands Enterprise Agency (RVO.nl) has issued early information on a tender it plans to launch on 30 July, looking for a company to undertake an archaeological study for three areas earmarked for offshore wind projects. 

  • 3 July 2019
    Contracts & Tenders, Wind Farm Update

    The Netherlands Enterprise Agency has awarded MMT with a contract to perform a geophysical soil investigation of the Ten Noorden van de Waddeneilanden wind farm zone. Project preparations are currently underway, with the fieldwork planned to be performed in July and August from MMT’s survey vessel Franklin. The geophysical survey comprises the collection of high-resolution bathymetry […]

  • 4 April 2019
    Environment, Wind Farm Update

    Pondera Consult has won a contract to carry out an Environmental Impact Assessment (EIA) for lots VI and VII in the Hollandse Kust (west) offshore wind energy area in the Dutch North Sea. Pondera will manage the environmental impact assessment, the appropriate assessment, and the assessment for the protection of species in the context of […]

  • 3 September 2019
    Contracts & Tenders

    The Netherlands Enterprise Agency (RVO.nl) is set to issue a tender in October for geotechnical investigation at the North of the Wadden Sea Islands offshore wind farm zone. RVO.nl will seek a company to carry out geotechnical soil investigations at the 700MW zone also known as Ten Noorden van de Waddeneilanden (TNW). The agency estimates that the tender […]

  • 16 August 2019
    Contracts & Tenders

    TenneT TSO is planning to issue two tenders in September regarding surveys for three offshore wind zones in the Netherlands. TenneT will be seeking a party to carry out non-UXO offshore and nearshore route survey activities at the Hollandse Kust (West Beta), Ten Noorden van de Waddeneilanden and IJmuiden Ver wind farm zones. In the second tender, the transmission operator will […]

  • 6 January 2020
    Contracts & Tenders, Grid Connection

    TenneT has awarded RPS Energy Ltd with a contract to provide unexploded ordnance (UXO) consultancy services covering zones in the Dutch North Sea identified in the Offshore Wind Energy Roadmap 2030. The tender covers six offshore wind zones, the 700MW Hollandse Kust Noord, the 700MW Hollandse Kust (west) Alpha, the 700MW Hollandse Kust (west) Beta, […]

  • 21 June 2019
    Grid Connection

    TenneT and the Dutch Ministry of Economic Affairs and Climate Policy (EZK) are holding a number of public meetings regarding the grid connection of the North of the Wadden Sea Islands offshore wind farm. The aim of the meetings is to learn the residents’ opinion on the cable connection route from the 700MW Ten Noorden van […]

  • 1 February 2019
    Authorities, Business & Finance

    The Netherlands Enterprise Agency (RVO.nl) is planning to issue a tender in March for geophysical investigation at the North of the Wadden Sea Islands offshore wind farm zone. The awarded company will be responsible for carrying out the surveys in the months of July, August and/or September at the 700MW zone also known as Ten Noorden […]

  • 16 January 2020
    Contracts & Tenders

    Fugro has won a contract for geotechnical site investigations at the Ten Noorden van de Waddeneilanden (TNW) offshore wind farm zone in the Netherlands. The fieldwork will take place from February to May at the 700MW wind farm zone also known as the North of the Wadden Sea Islands. According to Fugro, the project will comprise […]

  • 16 January 2020

    Fugro has won a contract for geotechnical site investigations at the Ten Noorden van de Waddeneilanden (TNW) offshore wind farm zone in the Netherlands. The fieldwork will take place from February to May at the 700MW wind farm zone also known as the North of the Wadden Sea Islands. According to Fugro, the project will […]

  • 10 February 2020
    Contracts & Tenders, Wind Farm Update

    The Norwegian Geotechnical Institute (NGI) has won a contract to develop an integrated ground model as part of a tender for geotechnical soil investigations at the Ten Noorden van de Waddeneilanden wind farm zone in the Dutch North Sea. The contract is valued at around EUR 300,000. As previously reported, under the same tender, the […]

  • 13 November 2019
    Grid Connection

    Dutch transmission system operator TenneT TSO B.V. has issued a tender for offshore unexploded ordnance (UXO) survey, identification and clearance at the zones identified in the Offshore Wind Energy Roadmap 2030. The tender covers the 700MW Hollandse Kust Noord, the 700MW Hollandse Kust (west) Alpha, the 700MW Hollandse Kust (west) Beta, the 700MW Ten noorden […]

  • 24 December 2018
    Authorities, R&D

    BLIX Consultancy and Pondera Consult have carried out a study on the Levelized Cost of Energy (LCoE) of future offshore wind farm sites in the Netherlands.

  • 14 March 2019
    Grid Connection, Wind Farm Update

    TenneT and the Dutch Ministry of Economic Affairs and Climate Policy (EZK) are inviting the public to provide comments on the infrastructure for connecting the North of the Wadden Sea Islands offshore wind project to the grid. The parties said that by gathering feedback on the 700MW Ten Noorden van de Waddeneilanden (TNW) project now, most promising routes are included in […]

  • 18 September 2019
    Contracts & Tenders, Grid Connection

    Dutch transmission system operator TenneT TSO B.V. has issued a tender seeking unexploded ordnance (UXO) consultancy services covering zones in the Dutch North Sea identified in the Offshore Wind Energy Roadmap 2030. As the designated offshore grid operator for the future wind farms, TenneT is responsible for the engineering, procurement, installation, construction, and operation of the […]

  • 9 October 2019
    Contracts & Tenders

    The Netherlands Enterprise Agency (RVO.nl) has issued a tender for geotechnical and ground model work at the North of the Wadden Sea Islands offshore wind farm zone. The tender comprises two lots in which two companies will be selected to respectively carry out a geotechnical survey and develop an integrated ground model at the 700MW zone also […]

  • 20 September 2019
    Contracts & Tenders

    TenneT TSO has issued a tender seeking non-UXO offshore route survey services covering zones in the Dutch North Sea identified in the Offshore Wind Energy Roadmap 2030. The tender covers the 700MW Hollandse Kust (west) Beta, the 700MW Ten noorden van de Waddeneilanden, the 2GW IJmuiden Ver Alpha, and the 2GW IJmuiden Ver Beta offshore wind farm zones. […]

  • 27 March 2018
    Authorities, Business & Finance, Environment, Grid Connection

    The Dutch government has presented the Offshore Wind Energy Roadmap 2030, setting out plans for the development of additional 7GW of offshore wind capacity in the 2024-2030 period.

  • 5 November 2018
    Authorities, Contracts & Tenders

    The Dutch government did not just single-handedly decide to go forward with zero-subsidy tenders, serious developers tell and show it is possible, and as long as this is the case the government will not provide unnecessary subsidies or other forms of market protection, Ruud de Bruijne from the Netherlands Enterprise Agency (RVO.nl) said in an interview with Offshore WIND.

  • 3 January 2019
    Authorities

    When it comes to emerging offshore wind markets, Taiwan, India and the U.S. have been in the spotlight over the last few years and especially in 2018. Nevertheless, a few new areas made the offshore wind map over the last year, beyond those already well known and ready for takeoff. Offshore wind is not only expanding as new markets emerge globally, but also as the countries with existing offshore wind farms and those under development already eye earmarking further areas where offshore wind turbines could be installed.  

  • 22 January 2015
    Business & Finance, Ports & Logistics, Vessels

    The number of offshore-related sea ships mooring in the Port of Den Helder rose in 2014 to 2,776, representing a 7 % growth compared to 2013. These numbers were revealed in the annual report of the Port of Den Helder.  “Thanks to sound agreements with the offshore companies, the fishery sector and the Royal Dutch Navy, […]

  • 3 June 2013
    Operations & Maintenance

    Following alterations to the bow and accommodation at the  Den Breejen shipyard in Hardinxveld-Giessendam, the re-vamped Crew Transfer Vessel “Offshore Wenduine” was renamed at a ceremony at the Koninklijke Roei en Zeilvereeniging “De Maas” in Rotterdam on Wednesday.  Related: The Netherlands: Offshore Wenduine Converts into Multi-Purpose Catamaran Work Boat The Champagne bottle was released onto […]

  • 9 May 2017
    Wind Farm Update

    Gravity-based foundations that will support the offshore wind turbines at the Tahkoluoto are currently lined up in Pori, Finland, and waiting for the installation vessel Vole au vent, due to arrive by the end of next week.

  • 7 July 2015
    Technology

    SCHOTTEL HYDRO will manufacture and deliver the variable pitch hub for the AR1500 turbine for Phase 1a of the MeyGen tidal energy project under contract to Lockheed Martin. The MeyGen Phase 1a AR1500, a 1.5 MW seabed mounted turbine, is being designed and delivered by Atlantis Resources and Lockheed Martin. The MeyGen project intends to […]