Search results for: SG 11.0-200 DD

30667 results

A list of search results

  • 30 June 2020
    Contracts & Tenders, Wind Farm Update

    Vattenfall has placed a firm order with Siemens Gamesa for 140 SG 11.0-200 DD wind turbines to be installed at the Hollandse Kust Zuid wind farm off the Netherlands. The Swedish offshore wind developer opted for Siemens Gamesa’s 11 MW turbine model with a 200-metre diameter rotor, and not the SG 11.0-193 DD Flex model […]

  • 30 July 2020
    Wind Farm Update

    The CrossWind consortium has opted for Siemens Gamesa’s SG 11.0-200 DD wind turbines for the 759 MW Hollandse Kust (noord) wind farm in the Dutch North Sea. According to the winning bid submitted by the consortium of Shell and Eneco, the wind farm will feature 69 Siemens Gamesa wind turbines, the Dutch government said. Each […]

  • 4 March 2020
    Contracts & Tenders, Technology, Wind Farm Update

    At both the 900MW Borkum Riffgrund 3 and the 242 MW Gode Wind 3 sites, Siemens Gamesa will deploy its new SG 11.0-200 DD offshore wind turbine.

  • 21 July 2020
    Contracts & Tenders, Wind Farm Update

    Vattenfall has appointed UXOcontrol as specialist contractor to complete the unexploded ordnance (UXO) identification campaign for the Hollandse Kust Zuid offshore wind project. When construction is completed, the 1.5 GW Hollandse Kust Zuid wind farm zone will cover an area of 225 km2 with water depths at site ranging from 18.1 to 27.8 metres. The […]

  • 19 May 2020
    R&D, Technology

    Siemens Gamesa has launched a new SG 14-222 DD offshore Direct Drive wind turbine. The new turbine model has a 14 MW capacity, reaching up to 15 MW using the company’s Power Boost function, a 222-metre diameter rotor, 108-metre long blades, and a 39,000 m2 swept area. The turbine prototype is expected to be ready […]

  • 26 May 2020
    Contracts & Tenders, Technology, Wind Farm Update

    Siemens Gamesa Renewable Energy will conditionally supply SG 14-222 Direct Drive offshore wind turbines to the 2,640 MW Dominion Energy Coastal Virginia Offshore Wind (CVOW) commercial project. This project will be home to Siemens Gamesa’s latest offshore turbine variant having the capability to produce up to 15 MW with a 222-metre rotor. The exact quantity […]

  • 21 February 2020
    Ports & Logistics, Vessels

    SAL’s M/V Wiebke has transported the new crane boom of Swire Blue Ocean’s jack-up Pacific Osprey from China to the Port of Esbjerg in Denmark. The crane boom was loaded onto M/V Wiebke at NOV’s manufacturing yard in China on 21 January and the vessel left the yard a day later. The crane boom will […]

  • 24 January 2020
    Vessels

    Swire Blue Ocean (SBO) has contracted Blue Water Shipping to transport Pacific Osprey’s new crane boom from NOV’s manufacturing yard in China to Denmark. The boom was loaded onto SAL’s M/V Wiebke on 21 January and left the yard the day after. The vessel is expected to reach Denmark around 1 March. SBO expects Pacific […]

  • 14 January 2020
    Contracts & Tenders, Vessels, Wind Farm Update

    Vattenfall has contracted Swire Blue Ocean for the installation of the Siemens Gamesa wind turbines at the Hollandse Kust Zuid wind farms in the Dutch North Sea. Using the wind farm installation vessel Pacific Osprey, Swire Blue Ocean will transport the various turbine components from the pre-assembly site on the Dutch coast to the wind […]

  • 27 February 2020
    Technology

    MacArtney’s new SG 11.0-193 DD Horizontal Single Blade Mounting (HSBM) tool is ready for market after passing a Site Acceptance Test at the Østerild Test Center in Denmark, the company said. Siemens Gamesa recently installed a prototype SG 11.0-193 DD wind turbine at one of the test stands in the Østerild Test Center. The new […]

  • 26 November 2019
    Technology

    Siemens Gamesa has expanded its product portfolio with the launch of the new Siemens Gamesa DD Flex concept and the SG 11.0-193 DD Flex offshore wind turbine. Built on the current largest offshore wind turbine in the Siemens Gamesa fleet, the SG 11.0-193 DD Flex can reach a capacity of 11MW under specific site conditions, […]

  • 16 June 2011
    Business & Finance

      The Alstom Board has approved a major reorganisation of the company proposed by Patrick Kron, Chairman and Chief Executive Officer of Alstom. This reorganisation is effective on 4 July 2011. Alstom has undergone a period of strong growth, followed by the necessary adaptation to a tougher economic environment created by the crisis. As the […]

  • 11 March 2020
    Technology

    Siemens Gamesa’s prototype SG 11.0-193 DD Flex wind turbine has produced 11MW of power, the turbine maker said. The prototype turbine was installed at the Østerild Test Center in Denmark at the beginning of February. Unveiled in November 2019, the SG 11.0-193 DD Flex turbine features a 193m diameter rotor using the 94m long Siemens […]

  • 7 February 2020
    R&D

    The installation of the Siemens Gamesa prototype SG 11.0-193 DD Flex turbine has been completed at the Østerild Test Center in Denmark.

  • 14 January 2020
    Technology

    The nacelle of Siemens Gamesa’s prototype SG 11.0-193 DD Flex turbine is being assembled at the Østerild Test Center in Denmark. The nacelle arrived in Østerild about a week ago, while the three blades were set to be transported from the Hanstholm harbor, craned and assembled shortly after. The nacelle prototype was produced in Brande, while […]

  • 7 January 2020
    R&D

    The components of Siemens Gamesa’s prototype SG 11.0-193 DD Flex turbine have started arriving in Østerild, Denmark, where they will be installed for testing. The nacelle has arrived in Østerild, while the three blades are expected to be transported from the Hanstholm harbor, craned and assembled at the end of this week, a spokesperson from Siemens […]

  • 11 March 2013

     Patrick Kron was appointed Chairman & CEO of Alstom on 11 March 2003. In the decade between 2003 and 2013, the company battled for survival from 2003 to 2005, then enjoyed strong growth in the years between 2006 and 2009, and finally coped with the global financial and economic crisis from 2010 onwards. On 21 […]

  • 30 April 2020
    Vessels

    Load tests of the new crane boom on Pacific Osprey have started, Swire Blue Ocean (SBO) said. The installation of the jack-up’s new crane boom started in the Port of Esbjerg earlier this month. The reeving of the main hook was completed last Friday, and on Saturday, the boom was lowered into the boom rest, […]

  • 29 June 2012
    Authorities

    At the EU summit held yesterday in Brussels, European Wind Energy Association (EWEA) has urged EU Leaders to: – Agree on investments in renewable energies and end fossil fuel subsidies – Increase EIB capital to fund renewable energy – Agree on procedures to divert EU funding towards renewable energy projects – Earmark EU Cohesion and Research […]

  • 27 November 2019
    Wind Farm Update

    Vattenfall has opted for the Siemens Gamesa 11MW turbines for the Hollandse Kust Zuid 1-4 offshore wind farms in the Netherlands. The Hollandse Kust Zuid wind farm zone is planned to be fitted with circa 140 units of Siemens Gamesa’s upgraded version of the Direct Drive turbine SG DD-193, which features the ability to reach […]

  • 19 July 2019
    Contracts & Tenders, Wind Farm Update

    Siemens Gamesa has conditionally received a record wind turbine order for 1,714MW from Ørsted and Eversource encompassing three US offshore wind projects. The signed conditional contract is the largest US offshore wind power order to date, Siemens Gamesa said. It covers the supply, delivery, and installation of SG 8.0-167 DD wind turbines including service agreements […]

  • 5 December 2017
    Business & Finance

    A spokesperson from Siemens Gamesa has confirmed to Offshore WIND that the company is launching an office for its offshore business segment in the Asia Pacific region, following social media posts reporting from an opening ceremony today, 5 December.

  • 16 April 2012

    The wind energy industry increased its contribution to the EU’s gross domestic product (GDP) by 33% between 2007 and 2010. In 2010, the industry’s growth was twice that of the EU’s GDP overall, with the sector contributing €32 billion to an EU economy in slowdown. Key figures from the ‘Green Growth’ report released today by […]

  • 30 April 2014
    Business & Finance

    The renewable energy industry has attracted almost £30 billion of private sector investment since 2010. This investment has enabled the industry to sustain over 100,000 jobs in 2013 and deliver 4.2% of UK energy. These are the findings of a new report published today by the REA: REview – Renewable Energy View: 2014. REview features […]

  • 17 July 2013
    Authorities, Business & Finance

    Investors will receive further certainty today of how the government will support investment in new energy infrastructure through the Energy Bill, in order to keep the lights on and bills and emissions down. The draft Electricity Market Reform Delivery Plan, published today for consultation, provides detail on the support mechanism (long-term Contracts for Difference) and […]

  • 12 January 2012

    In the latest example of cities getting behind wind power and other renewable energies, Shanghai has announced it might spend as much as €2 billion in the next four years to increase its capacity of green energy, with more than half earmarked for onshore and offshore wind farms. Shanghai, the largest metropolis in China with […]