Search results for: Royal Wagenborg

562 results

A list of search results

4 April 2016 Grid Connection, Vessels, Wind Farm Update

[…]

26 April 2016 Grid Connection, Vessels, Wind Farm Update

[…]

5 December 2017 Operations & Maintenance, R&D, Technology, Vessels

Replacing a jack-up with a barge equipped with a Blade Exchange Tool to remove and install blades and other turbine components offshore leads to significant cost reductions, Guido Vletter, Project Engineer at Temporary Works Design (TWD) said.

15 October 2014 Operations & Maintenance, Technology, Vessels

[…]

5 March 2018 Ports & Logistics, Vessels, Wind Farm Update

Jan De Nul’s wind turbine installation vessel Vole au vent has left the port of Eemshaven loaded with the first set of monopiles and transition pieces to be installed on the 450MW Borkum Riffgrund 2 wind farm in the German North Sea.

23 March 2015 Business & Finance, Technology, Vessels

[…]

14 November 2014 Business & Finance, Operations & Maintenance

[…]

29 October 2013 Operations & Maintenance

[…]