Search results for: Ro/Ro

12047 results

A list of search results

  • 23 January 2018
    Ports & Logistics

    Blue Water Shipping (BWS) has put into operation a new 116,000m² multiterminal in the East Port area of the Port of Esbjerg in Denmark, boosting its capabilities to accommodate RoRo vessel traffic, which has increased at the port with the wind turbine industry’s use of RoRo vessels and more operations by the existing RoRo customers.

  • 27 August 2013
    Operations & Maintenance

    When the Rader Hochbrücke, which crosses the Kiel Cana,l was closed for trucks in August, Vestas was likely to have problems with their wind turbine transports by road. Blue Water works closely with Vestas and chartered the ro/ro ferry “Clipper Pennant” with very short warning to transport the turbines by sea instead. Blue Water has […]

  • 4 February 2013

    In January, Blue Water Shipping loaded the ro/ro vessel “Seatruck Pace” at the Port of Esbjerg with the first turbines for the Offshore Wind Farm Gwynt Y Mor in Great Britain where a total of 160 turbines are to be installed. Blue Water has been awarded the transport contract of 130 turbines from Esbjerg to […]

  • 7 November 2016
    Operations & Maintenance, Technology, Vessels

    Siemens has recently taken delivery of a heavy cargo “roll on/roll off ” (RoRo) coaster specifically designed for the transportation of wind turbine parts. The Rotra Vente, delivered and commissioned by The Concordia Group, is 141 meters long and 20 meters wide. The vessel has a specially developed bow and the extendable ramp controlled by hydraulic systems. […]

  • 21 March 2018
    Operations & Maintenance, Ports & Logistics, Vessels, Wind Farm Update

    Siemens Gamesa has shipped out the first nacelles for the 309MW Rentel offshore wind farm from Cuxhaven, Germany, to the installation port in Ostend, Belgium.

  • 23 March 2018
    Vessels, Wind Farm Update

    First nacelles for the offshore wind turbines that will spin at the Rentel wind farm have arrived at the REBO site in Ostend, Belgium, after being shipped from the Siemens Gamesa factory in Cuxhaven.

  • 2 December 2016
    Ports & Logistics, Vessels

    Today, the Port of Esbjerg is hosting Siemens Wind Power’s official presentation of its first customised “roll on/roll off ” (RoRo) transport vessel, Rotra Vente. “We look forward to seeing the vessels frequently at the Port, where we are currently building two new RoRo ramps and expanding our piers to accommodate even more vessels,” the Port […]

  • 16 March 2017
    Vessels

    Siemens Wind Power’s second roll on/roll off (Ro-Ro) vessel customized to transport wind turbine components, Rotra Mare, has arrived at the Port of Esbjerg and is ready to go into service.

  • 24 October 2017
    Business & Finance, Ports & Logistics

    Following the completion of the works on the expansion at the Port of Esbjerg, the port took over the new harbour area in mid-October. 

  • 25 January 2016

    The Niedersachsen Ports GmbH & Co. KG has invited tenders for the reconstruction of a harbour area at berth 9.3 in Cuxhaven harbour. The planned area covers approx. 10,000m². The associated handling services in the berth area will include RoRo and LoLo services, cargo and sea freight, and offshore wind farm services. The works also include the construction of […]

  • 30 December 2019
    Contracts & Tenders

    The French Port of Le Havre has issued a tender for reinforcement works on the Hermann du Pasquier quay as part of the offshore wind reception. The works will include the construction of a roll on/roll off (RoRo) platform, as well as the execution studies. The platform will be 75m long and 25m wide and […]

  • 2 April 2018
    Ports & Logistics, Wind Farm Update

    The assembly of the wind turbine towers for the 309MW Rentel offshore wind farm has started at the Port of Ostend in Belgium, Otary Group, the owner and developer of the project, said.

  • 16 August 2012
    Ports & Logistics

    Germany’s ambition is to have 2.500 turbines installed in its territorial waters in the North and Baltic Seas by 2030. This means that on an average of 250 turbines will have to be produced and installed each year. This cannot be handled by one port alone and therefore several German ports are now trying to […]

  • 13 November 2016

    Vattenfall Wins Kriegers Flak Tender with EUR 49.9 per MWh Bid Swedish energy company Vattenfall has won the tender to build the 600MW Kriegers Flak offshore wind farm in the Danish part of the Baltic Sea with the lowest ever bid of EUR 49.9 per MWh, 58% below the original cap of EUR 120 per […]

  • 14 February 2018
    Vessels, Wind Farm Update

    Today, 14 February, Siemens’s Rotra Mare roll on/roll off (Ro-Ro) vessel brought the first Siemens Gamesa 7MW wind turbine components for the Rentel offshore wind farm to the REBO site in Ostend. Two blade sets and six top towers have been shipped from Esbjerg.

  • 17 November 2015

    Siemens presented a new offshore logistics concept at EWEA 2015 in Paris. The company has signed a long-term framework contract with transport service provider deugro Danmark A/S, utilizing two purpose-built transport vessels to efficiently link Siemens’ existing production locations in Denmark with the new production facilities in Cuxhaven in Germany and Hull in the UK. Instead of loading […]

  • 6 June 2018
    Business & Finance, Jobs & Recruitment, Ports & Logistics

    Siemens Gamesa Renewable Energy has officially inaugurated its offshore nacelle plant in Cuxhaven, Germany.

  • 17 March 2016
    Business & Finance, Ports & Logistics

    The Port of Esbjerg reported a net profit of EUR 10.31 million for 2015, which is slightly below the high profits over the past years. With a turnover of EUR 30.03 million (EUR 30.17 million in 2014), the Port deemed its results satisfactory and said its business strategy is working even though market conditions have changed. “The net profit […]

  • 20 March 2013
    Business & Finance

    With a loan of EUR 74 million a consortium of banks led by KfW IPEX-Bank is supporting the construction of two ultra-modern special transporters to be built at the Flensburg-based FSG shipyard for the Dutch heavy lift shipping company RollDock. KfW IPEX-Bank contributes EUR 37 million to the financing. The Dutch banks ABN AMRO and […]

  • 28 August 2012

    Damen Shipyards presents a new shipping concept to the market – the Damen Offshore Carrier (DOC) 7500 – specifically designed as a smaller heavy transport, offshore installation and ro-ro platform suitable for multiple markets. The Damen Offshore Carrier aims to provide flexibility and year-round utilisation. Damen developed the new vessel in cooperation with Singapore based […]

  • 5 December 2016

    Vattenfall Wins Kriegers Flak Tender with EUR 49.9 per MWh Bid Swedish energy company Vattenfall has won the tender to build the 600MW Kriegers Flak offshore wind farm in the Danish part of the Baltic Sea with the lowest ever bid of EUR 49.9 per MWh, 58% below the original cap of EUR 120 per […]

  • 24 October 2019
    Ports & Logistics

    Denmark’s Rønne Harbour on the Island of Bornholm is ready to receive the wind turbines for Vattenfall’s 605MW Kriegers Flak offshore wind farm after completing the necessary upgrades. The Rønne Harbour was selected as the departure point for the 72 Siemens Gamesa 8MW turbines in June 2018. To enable the project execution, Rønne Havn A/S started port upgrades […]

  • 22 March 2017
    Business & Finance, Contracts & Tenders, Ports & Logistics

    Offshore wind farm components accounting for 1,100MW of capacity were shipped from the Port of Esbjerg in 2016, more than double the amount in 2015, according to the port, which reported a record turnover of EUR 30.94 million and a record net profit of EUR 10.68 million for 2016.

  • 4 December 2017
    Environment, Operations & Maintenance, Ports & Logistics, R&D, Technology

    Siemens has received an order from EWE Netz GmbH to supply components of a Siharbor shore power supply system in Cuxhaven to be used by, among others, vessels transporting Siemens Gamesa’s offshore wind turbine components.

  • 23 August 2017

    Lower Saxony’s Minister of Economics, Labour and Transport Olaf Lies has inaugurated a new berthing space and a new ramp at the port of Cuxhaven’s offshore terminal.

  • 23 February 2018
    Ports & Logistics

    The Mukran Port is upgrading two berths with new heavy load slabs to be used in the construction of the Arkona offshore wind farm.