Search results for: OSY platform

47 results

A list of search results

5 April 2019 Grid Connection

The topside of Elia’s Offshore SwitchYard (OSY) platform has left Heerema Fabrication Group’s construction site in Zwijndrecht, the Netherlands, and was loaded onto a barge. According to Elia, the topside left the construction site this morning, which represents the first step in the journey towards its final destination in the Belgian North Sea. The topside will […]

6 November 2018 Grid Connection, Vessels

Seaway Heavy Lifting's Oleg Strashnov has started installing the jacket foundation for Elia's Offshore Switchyard Platform (OSY) in the Belgian North Sea.

24 October 2018 Grid Connection, Ports & Logistics

Heerema Fabrication Group (HFG) has loaded the jacket foundation for Elia’s Offshore SwitchYard (OSY) platform onto a barge at the Vlissingen yard.

6 August 2018 Operations & Maintenance

Heerema Fabrication Group has conducted roll-up operations of the jacket foundation for the Offshore SwitchYard (OSY) platform, part of Elia's Modular Offshore Grid (MOG) project.

12 March 2018 Contracts & Tenders, Grid Connection, Operations & Maintenance

Belgian transmission system operator Elia has awarded Heerema Fabrication Group (HFG) with a contract for the fabrication of the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid (MOG) project in the Belgian North Sea.

6 March 2018 Contracts & Tenders, Grid Connection

Belgian transmission system operator Elia has appointed London Offshore Consultants (France) SARL as the marine warranty surveyor for submarine cables and the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid (MOG) project in the Belgian North Sea.

6 March 2018 Contracts & Tenders, Grid Connection

Seaway Heavy Lifting (SHL) has secured a contract to install the Offshore SwitchYard (OSY) platform for Elia's Modular Offshore Grid (MOG) project in the Belgian North Sea.

30 June 2017 Contracts & Tenders, Grid Connection

A detailed design of the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid project being developed by Belgian transmission system operator Elia will soon be open for construction tendering, Ramboll informed. 

2 May 2017 Contracts & Tenders, Grid Connection, R&D, Technology

Belgian transmission system operator Elia has invited tenders for the fabrication of the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid (MOG) project in the Belgian North Sea.

22 December 2016 Business & Finance, Grid Connection

Ramboll Danmark A/S has won a contract to provide a detailed design of the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid project being developed by Belgian transmission system operator Elia.  The OSY platform will be situated up to 45 kilometres off Belgian North Sea coast, in water depths between 30m-35m. The detailed design scope comprises but is […]

1 July 2016 Business & Finance, Grid Connection, R&D, Technology

Belgian transmission system operator Elia has issued two separate calls for bids, one for a detailed design of an offshore platform, and the other for an EPC contract for submarine cables that will link the company's Modular Offshore Grid to the mainland infrastructure. The OSY platform will be situated up to 45 kms offshore Belgian North Sea […]

15 July 2015 R&D

The Fundy Ocean Research Center for Energy (FORCE) has unveiled two advanced underwater monitoring platforms, now in their final stages of testing in Dartmouth before sea trials in the Bay of Fundy. “To harness the enormous power of the Bay of Fundy responsibly, we have to understand it,” said FORCE general manager Tony Wright. “We’ve […]

29 March 2019 Grid Connection

The topside of Elia's OffshoreSwitchYard (OSY) platform is expected to be installed on its jacket foundation in the Belgian North Sea in mid-April, the Belgian energy company said. The OSY platform, constructed by Heerema Fabrication Group, is the centerpiece of Elia's EUR 400 million Modular Offshore Grid (MOG) project through which Rentel, Northwester 2, and SeaMade offshore […]

7 November 2018 Grid Connection

Belgian utility Elia has shared a video showing the installation of the jacket foundation for the Offshore Switchyard Platform (OSY) in the Belgian North Sea.

16 April 2018 Contracts & Tenders, Grid Connection

The Paris office of LOC Renewables, a part of LOC Group has been contracted by the Belgian transmission system operator Elia to provide Marine Warranty Survey (MWS) services for the Modular Offshore Grid (MOG) project.

16 March 2018 Business & Finance, Contracts & Tenders, Grid Connection

Belgian transmission system operator Elia is on track to complete the Modular Offshore Grid by September 2019 after awarding all the main contracts for the project.

14 June 2017 Contracts & Tenders, Grid Connection

Belgian transmission system operator Elia has invited tenders for unexploded ordnance (UXO) survey, identification and removal on the cable route of the Modular Offshore Grid (MOG) project in the Belgian sector of the North Sea.

20 January 2017 Contracts & Tenders, Grid Connection, Technology

Elia Asset N.V., part of the Elia Group, has invited tenders for the installation of the Offshore SwitchYard (OSY) Platform for the Modular Offshore Grid (MOG) project in the Belgian North Sea. The contract includes, but is not limited to, installation, engineering, providing cargo barge, transport to the offshore location and demobilisation of the installation […]

23 April 2019 Environment, R&D

The Lake Erie Energy Development Corporation (LEEDCo) and the Cooperative Institute for Great Lakes Research (CIGLR) have entered an agreement to together conduct studies on the U.S. Icebreaker offshore wind project. LEEDCo and CIGLR, part of the University of Michigan, will focus on research to monitor and understand large scale processes on Lake Erie, as well as […]

12 February 2019 Business & Finance, R&D, Technology

Experimental wind power developer Makani, owned by Google parent company Alphabet, has partnered with the energy giant Shell to bring its energy kites to offshore environments. After five years of development at X and more than a decade of development in total, Makani is now an independent company and is partnering with Shell to expand […]

24 January 2019 Contracts & Tenders, Grid Connection

The NHV Group has won a contract with Elia to provide helicopter services in support of the construction of a high voltage electricity grid in the Belgian part of the North Sea. The operations are expected to start in April 2019 with the flights departing from NHV’s base in Ostend. NHV will support this project […]

31 October 2018 Contracts & Tenders

Hellenic Cables has signed a contract with Vos Prodect Innovations for the design and delivery of sealed cable hang-off systems for the Modular Offshore Grid (MOG) in Belgium.

20 April 2018 R&D, Technology

French floating LiDAR developer Akrocean has deployed a WINDSEA buoy at the Fécamp met mast as part of the type 2 validation process of the OWA Carbon Trust Roadmap.

17 April 2018 Business & Finance, Contracts & Tenders, Operations & Maintenance, Technology

Independent wind asset operations management specialist OutSmart BV has selected Kongsberg Digital AS to provide an integrated management system on the Kognifai digital platform and ecosystem which will be used to manage OutSmart’s onshore and offshore wind turbine portfolio.

6 February 2018 Grid Connection, Operations & Maintenance, R&D, Wind Farm Update

The first Siemens Offshore Transformer Module (OTM) has left Rosyth and is on its way to the Beatrice offshore wind farm in the Outer Moray Firth, Scotland.

17 August 2017 Business & Finance, Grid Connection, Vessels

Belgian transmission system operator Elia has awarded Dredging International, part of the DEME Group, with a contract for the subsea cable installation for the Modular Offshore Grid (MOG) in the Belgian part of the North Sea.