Search results for: Nexans Aurora

6 results

A list of search results

15 May 2019 Vessels

Ulstein Verft has selected Palfinger Marine to deliver a new major deck equipment package for the DP3 cable laying vessel Nexans Aurora. The order consists of cranes, winches and lifesaving appliances, including two LBT 935 lifeboats with the belonging davits and one life raft davit on each side of the vessel. According to Palfinger, the lifeboats are […]

6 May 2019 Vessels

Ulstein Verft has held the keel laying ceremony for Nexans' DP3 cable laying vessel (CLV) Nexans Aurora. According to Ulstein, the keel laying, held on 24 April, marks the start of assembling the grand blocks of the 149.9m long vessel. The hull is being built at Crist in Poland while the engineering, outfitting and system integration, […]

19 February 2019 Vessels

Ulstein Verft has cut the first steel for Nexans' DP3 cable laying vessel C/S Aurora. The hull is being built at Crist in Poland, while the engineering, outfitting and system integration, as well as equipment preparation, testing, sea trials and finalizing are carried out at Ulstein Verft in Norway. Designed by Norwegian company Skipsteknisk, the […]

21 August 2018 Contracts & Tenders, Operations & Maintenance, Vessels

Ulstein Verft has contracted Palfinger Marine to provide a major deck equipment package for Nexans' new cable laying vessel Aurora.

5 July 2018 Business & Finance, Contracts & Tenders, Vessels

Following news that Nexans signed a deal with Ulstein Verft for the construction of its new cable laying vessel, the Nexans Aurora, UK marine engineering company MAATS Tech informed that it will supply a deck spread for the vessel.

4 July 2018 Contracts & Tenders, Vessels

Nexans Subsea Operations and Ulstein Verft have signed a contract for the construction of a large, DP3 cable laying vessel, to be named Nexans Aurora and delivered in 2021.