Search results for: Haliade-X 12MW

28072 results

A list of search results

  • 12 November 2019
    Technology

    GE Renewable Energy has posted a video showing the installation time-lapse of the Haliade-X 12MW wind turbine at Maasvlakte, the Port of Rotterdam. The GE Haliade-X 12MW prototype wind turbine produced its first power at the beginning of November. It features three LM Wind Power 107-meter-long blades, currently the world’s largest, which were installed in […]

  • 13 November 2019
    Technology

    GE Renewable Energy has signed a cooperation agreement with State Power Investment Corp (SPIC) to bring the Haliade-X 12MW offshore wind turbine to China. GE announced in March last year that it will invest more than USD 400 million to develop and deploy Haliade-X 12MW, the world’s most powerful offshore wind turbine. The first unit was installed […]

  • 13 August 2019
    Technology

    GE Renewable Energy has sent off the nacelle of the Haliade-X 12MW offshore wind turbine from its production site in Saint-Nazaire, France, to Rotterdam, the Netherlands. The Haliade-X 12MW components will be assembled in Rotterdam-Maasvlakte, after which the turbine will be installed onshore to facilitate access for testing during the initial period of operations. This initial phase is expected […]

  • 14 October 2019
    Technology

    The first blade has been installed on the prototype GE Haliade-X 12MW offshore wind turbine in Maasvlakte, according to the live webcam feed at the Port of Rotterdam. LM Wind Power is producing the 107m blades, the world’s largest, at its plant in Cherbourgh, France. The first piece was rolled out in June. To remind, GE Renewable Energy announced in March last year that […]

  • 16 October 2019
    Technology

    The third and final 107m blade has arrived in the Port of Rotterdam and is awaiting to be installed on the prototype GE Haliade-X 12MW offshore wind turbine. To remind, the first blade was installed on the Haliade-X 12MW turbine located at Sif’s Maasvlakte 2 terminal on 14 October, with the second piece following the day […]

  • 17 October 2019
    Technology

    The third and final 107m blade has been installed on the prototype GE Haliade-X 12MW offshore wind turbine in Maasvlakte, the Port of Rotterdam. The first blade was installed on the Haliade-X 12MW turbine located at Sif’s Maasvlakte 2 terminal on 14 October, with the second piece following the day later. LM Wind Power manufactured the 107m blades, the world’s largest, at its […]

  • 3 July 2019
    R&D, Technology

    GE Renewable Energy has installed three out of four tower sections which will support the prototype Haliade-X 12 MW wind turbine at Maasvlakte in the Port of Rotterdam, the Netherlands. The final tower section will be installed once the nacelle arrives at Maasvlakte during the summer, GE Renewable Energy said. The Haliade-X 12 MW nacelle […]

  • 1 March 2018
    Business & Finance, R&D, Technology

    GE Renewable Energy GE will invest more than USD 400 million over the next three to five years to develop and deploy the largest, most powerful offshore wind turbine – the Haliade-X 12 MW.

  • 14 August 2019
    Business & Finance

    LM Wind Power has sent off the first 107m long blade for GE’s Haliade-X 12MW turbine from its factory in Cherbourg, France, to the UK where it will undergo testing. The LM 107.0 P blade, the world’s largest, was loaded onto a vessel on 13 August in the Cherbourg harbor and began its journey to the […]

  • 1 April 2019
    Ports & Logistics, R&D, Technology

    Future Wind has organized a ground-breaking event in Maasvlakte, Rotterdam, to mark the start of preparatory activities to host GE’s Haliade-X 12 MW wind turbine prototype. Earlier this year, GE Renewable Energy and Future Wind, a joint venture between Pondera Development and SIF Holding Netherlands, signed an agreement to install the first Haliade-X 12 MW wind […]

  • 18 April 2019
    R&D

    LM Wind Power has produced the first blade for GE’s Haliade-X 12MW offshore wind turbine at its factory in Cherbourg, France. According to LM Wind Power, the 107m long blade, the world’s largest, has completed the molding process. The LM 107.0 P will now proceed with post-molding finishing touches, before undergoing testing and validation to demonstrate its ability […]

  • 26 April 2019
    Business & Finance

    GE Renewable Energy is holding a series of supply chain engagement events in the UK for its Haliade-X 12MW offshore wind turbine. The events are part of GE’s supply chain plan for the world’s most powerful offshore wind turbine and will welcome potential suppliers that have suitable products or services that could support its production. GE […]

  • 15 April 2019
    Contracts & Tenders

    GE Renewable Energy and GMB Civiel BV have selected Royal HaskoningDHV to provide the foundation design for Haliade-X 12MW, the world’s most powerful offshore wind turbine. The design is based on a piled foundation, with a large concrete block on top and a 28m diameter, said to meet the technical requirements without over-dimensioning. RHDHV said that […]

  • 21 June 2019
    Ports & Logistics

    LM Wind Power has rolled out the first blade for GE’s Haliade-X 12MW offshore wind turbine at its factory in Cherbourg, France. According to the company, the 107m long blade, the world’s largest, has made its first trip outside the factory. Final preparations for the shipment of the LM 107.0 P blade to Maasvlakte-Rotterdam in the Netherlands are now […]

  • 5 June 2018
    R&D, Technology

    A full prototype Haliade-X 12 MW wind turbine will be installed at a yet-to-be-determined site in 2019, GE Renewable Energy said.

  • 17 July 2019
    Grid Connection, Technology

    Visser & Smit Hanab has completed the cable connection which will link the prototype Haliade-X 12 MW wind turbine at Maasvlakte 2 in the Port of Rotterdam to the Stedin high-voltage station. The 1.5-kilometre, 66kV connection was tested on 16 and 17 July, after which it was put into operation, Visser & Smit Hanab said. GE Renewable […]

  • 12 April 2019
    Ports & Logistics

    GE Renewable Energy is currently preparing the site in Maasvlakte, the Netherlands, for installation of its Haliade-X 12MW wind turbine prototype. Preparations of the site which will host the world’s most powerful offshore wind turbine are being carried out in partnership with Future Wind. The two companies signed an agreement at the beginning of the year […]

  • 11 June 2019
    Ports & Logistics, Technology

    Spanish turbine tower manufacturer GRI has shipped out the four tower sections that will be part of GE’s Haliade-X 12 MW prototype to be installed later this summer in Maasvlakte-Rotterdam. The four segments at GRI’s site in Seville will be arriving in the Netherlands before the end of the month, GE Renewable Energy said. Upon arrival […]

  • 13 November 2019
    R&D, Technology

    A nacelle from GE Renewable Energy’s Haliade-X 12 MW offshore wind turbine has arrived at the Offshore Renewable Energy (ORE) Catapult’s testing facility in Blyth, Northumberland, ahead of a testing programme designed to prepare it for years of operation at sea. This nacelle, comparable in size to six double-decker London buses, will undergo full indoor […]

  • 15 August 2019
    Technology

    The first LM 107.0 P blade for GE’s Haliade-X 12MW turbine has arrived at Offshore Renewable Energy (ORE) Catapult’s testing site in Blyth, the UK. Over the coming months, the blade will undergo advanced testing procedures, with static and fatigue tests to demonstrate its ability to withstand peak wind conditions and simulate its readiness for […]

  • 22 July 2019
    Technology

    GE Renewable Energy has revealed the first nacelle of the Haliade-X 12 MW offshore wind turbine at its production site in Saint-Nazaire, France. The nacelle will be shipped from Saint-Nazaire to Rotterdam-Maasvlakte in the Netherlands over the coming weeks, where its components will be assembled into the Haliade-X 12 MW prototype to be tested there. […]

  • 16 January 2019
    Business & Finance, Technology

    GE Renewable Energy and Future Wind, a joint venture of Pondera Development and Sif, have signed an agreement to install the first Haliade-X 12MW wind turbine prototype in the Port of Rotterdam this summer. The agreement, which will see the Haliade-X 12MW prototype installed onshore to facilitate access for testing, includes five years of testing and […]

  • 16 May 2019
    Business & Finance, Technology

    Vattenfall and GE Renewable Energy plan to join forces in the deployment of GE’s new wind turbine, the Haliade-X 12 MW, in Europe. With a capacity of 12MW, the Haliade-X is the largest offshore wind turbine on the market to date. Development and production of the new 12MW turbine will mostly take place in France. […]

  • 10 May 2018
    Technology

    GE Renewable Energy has revealed additional details on the size and power of the Haliade-X 12 MW offshore wind turbine.

  • 10 October 2019
    R&D

    The first blade for the prototype GE Haliade-X 12 MW offshore wind turbine has arrived at Maasvlakte, according to the live webcam feed at the Port of Rotterdam. LM Wind Power is producing the 107m blades for the prototype turbine at its plant in Cherbourgh, France. According to ECN, part of TNO,  the measurement mast and the scanning LiDAR have been […]

  • 7 November 2019
    Technology

    The GE Haliade-X 12MW prototype wind turbine located at Maasvlakte, the Port of Rotterdam, has produced its first power. According to GE, local teams will now proceed with the testing phase, during which different types of measurements will be performed to obtain a Type Certificate for the Haliade-X in 2020. The serial production of the […]