Search results for: Eemshaven port

10417 results

A list of search results

  • 10 April 2016
    Authorities, Business & Finance, Environment, Grid Connection, Operations & Maintenance, Vessels, Wind Farm Update

    World’s Largest OW Jack-Up Vessel Installs World’s Heaviest Monopile at Veja Mate OWF Offshore construction of the Veja Mate offshore wind farm has started with Seajacks Scylla having installed the heaviest monopile produced so far at the project site, according to DGI Doedijns, which provided hydraulic and software equipment for the pile-gripper used at the […]

  • 5 August 2013

    At the end of July, the „INNOVATION“ arrived at the Orange Blue Terminal in Eemshaven. This was not the first assignment at the Dutch offshore terminal for the modern heavy lift jack-up vessel from HGO InfraSea Solutions, which installs foundations at the Global Tech I wind park for HOCHTIEF Solutions. However, its premier jack-up occurred […]

  • 3 March 2020
    Contracts & Tenders

    GE Renewable Energy has contracted DHSS for vessel agency and port logistics services during the O&M phase of the Merkur offshore wind project in Germany. DHSS has been the service provider for GE since the start of the project’s construction phase in 2018 with regards to logistical services for the involved service operation vessels (SOVs) […]

  • 17 April 2018
    Operations & Maintenance, Technology, Vessels

    MPI Offshore’s wind turbine installation vessel (WTIV) MPI Enterprise was upgraded with spudcans during drydocking activities in Rotterdam, the Netherlands.

  • 23 December 2011

    The Gerd Buss Stevedoring wants to strengthen its market position in 2012. Buss’ subsidiary has wide product portfolio and location-independent services. “We look forward with confidence to the coming year 2012. The Gerd Buss Stevedoring is well positioned in the industry.“ said Wilfried Gerotzke, Managing Director of Gerd Buss Stevedoring. The fact that they are […]

  • 6 March 2018
    Vessels, Wind Farm Update

    Jan De Nul’s offshore installation vessel Vole au vent has installed the first monopile on Ørsted’s 450MW Borkum Riffgrund 2 offshore wind farm in the German North Sea.

  • 15 March 2016
    Vessels

    Seajacks Scylla had her maiden call in IJmuiden on 14 March. The 139m long installation vessel, dedicated to the offshore energy market, can be adjusted to any project, which is the reason of Scylla’s visit to IJmuiden. The first project for the vessel is the installation of monopiles for German Veja Mate offshore wind farm, where […]

  • 30 July 2015
    Vessels

    Offshore WIND’s photo of the day: Seajacks Scylla with all four legs installed. The offshore wind farm installation vessel has been fitted with all four legs at Samsung Heavy Industries. Scylla is outfitted with 105 metre long legs that have the ability to install components in water depths of up to 65m. The vessel also […]

  • 8 May 2018
    Grid Connection

    DOC-Swan Hunter, a joint venture partnership between Dutch Offshore Contractors and Swan Hunter, has completed the transportation of inter-array cables for an offshore wind project in Germany.

  • 7 March 2017
    Vessels, Wind Farm Update

    MPI Offshore’s wind turbine installation vessel MPI Enterprise has installed the first Senvion 6.2M-126 turbine at the 332MW Nordsee One offshore wind farm in the German North Sea.

  • 29 November 2018
    Business & Finance, Vessels

    EMS Maritime Offshore (EMO) has taken over agency services for the service operations vessel (SOV) Windea La Cour in the port of Eemshaven, the Netherlands.

  • 11 May 2018
    Ports & Logistics, Vessels

    Dutch offshore logistics service provider DHSS has completed the first CTV cargo run from its base in Eemshaven to the service operations vessel VOS Start at the Borkum Riffgrund 2 offshore wind farm in the German North Sea.

  • 18 September 2014
    Business & Finance, Technology, Wind Farm Update

    RentOcean, a 100 percent owned subsidiary of Oceanteam Shipping ASA, has been awarded a contract to supply Van Oord Offshore Wind Projects BV a 3000t demountable onshore turntable system and accompanying equipment for a long-term storage project. The turntable and additional equipment will be used for storage of cables at Eemshaven, The Netherlands for the Gemini Offshore Wind Farm. […]

  • 24 July 2019
    Wind Farm Update

    Jan De Nul’s offshore installation vessel Taillevent has begun loading the first turbine components for the Trianel Windpark Borkum II (TWBII) offshore wind farm. The 200MW TWBII offshore wind farm will comprise 32 Senvion 6.2M152 turbines installed at the project site some 40km north of the island of Borkum in Germany. Taillevent loaded the first three towers, blades […]

  • 17 June 2013
    Operations & Maintenance, R&D, Training & Education

    Students of the Department of Maritime Transport from the Jade University of Applied Sciences have developed a transport concept for maintenance of wind farms in the German Bight. Under the guidance of Professors Ralf Brauner and Christian Jauernig, they have created a fictitious company that offers a pickup service of technicians to offshore wind farms […]

  • 8 March 2017
    Vessels, Wind Farm Update

    innogy SE has shared several photos showing the installation of the first and the second Senvion 6.2M126 turbine at the 332ME Nordsee One offshore wind farm in the German North Sea.

  • 28 March 2018
    Contracts & Tenders, Operations & Maintenance, Vessels, Wind Farm Update

    Acta Marine has won a contract to assist Tideway B.V. with its cable pull in and testing and termination campaign on the Merkur offshore wind farm in the German North Sea. Under the contract, Acta Marine will charter its walk-to-work (W2W) construction support vessel Acta Orion, which will be performing accommodation and W2W services on the […]

  • 29 February 2016
    Grid Connection, Operations & Maintenance, Wind Farm Update

    The construction of the 600MW Gemini offshore wind farm off the coast of the Netherlands has reached an important milestone after the farm’s first wind turbines started producing electricity and feeding it into the grid. Following the construction of the electric infrastructure last year and the installation of the turbine foundations, contractors Siemens and Van Oord installed […]

  • 29 June 2017
    Wind Farm Update

    The Buss Orange Blue Terminal signed a contract with offshore wind farm constructor GeoSea N.V. for the handling and storage of the transition pieces for the fundamental structures of the 396MW Merkur offshore wind farm.

  • 8 April 2019
    Grid Connection

    The Netherlands-based WIND has completed the transport of high-voltage subsea cable destined to connect an undisclosed offshore wind farm in Europe to its substation. WIND said it transferred 26km of 155kV subsea cable from China to the Port of Eemshaven, the Netherlands, and delivered it to a large European transmission system operator (TSO). The 2,300t cables were loaded […]

  • 28 October 2019
    Vessels

    Acta Marine’s offshore wind service vessel Acta Centaurus has finished its work at the Deutsche Bucht wind farm in Germany, according to DHSS. The walk-to-work vessel, christened in Den Helder in the Netherlands on 22 May, debuted on the Deutsche Bucht wind farm under a contract with MHI Vestas. According to DHSS, whose support base in Eemshaven […]

  • 2 April 2018
    Ports & Logistics, Vessels

    Acta Marine’s walk-to-work (W2W) vessel Acta Auriga has arrived from Ulsteinvik, Norway, to the port of Eemshaven, the Netherlands, where it will be prepared for its first work on the BARD Offshore 1 wind farm.

  • 20 October 2015
    Vessels

    The boat building specialist Mainstay Marine Solutions has delivered the 20m vessel Porth Nefyn to transfer vessel operator Turbine Transfers. The Porth Nefyn will work principally on offshore European wind farm sites between the Baltic and Irish Seas. The vessel is an extended version of the existing 18m CE class vessel Porth Eilian. It has […]

  • 17 September 2019
    Operations & Maintenance

    C-bed’s accommodation vessel Wind Innovation is servicing the installation and commissioning phases of the Trianel Windpark Borkum II (TWBII) project in Germany. The DP2 walk-to-work vessel began its deployment at the project site some 45km off the coast of the Borkum island at the end of July. C-bed is using Eemshaven as the base port for crew change and […]

  • 12 September 2013
    Ports & Logistics

    The EMS Maritime Offshore GmbH newly opened up an offshore service station (OSS) in the port of Borkum. From the 1st of October 2013 the EMS Maritime Offshore GmbH is able to offer different services for shipping companies, offshore wind farm operators and / or wind turbine manufactures on the north sea island Borkum. In […]

  • 17 November 2014

    Activities are in progress on the 100km export cable route for the 600MW Gemini wind farm project, located 85km from the coast of Groningen. Gemini will have 2 export cables that will connect two offshore substations to the eventual land fall at the Dutch port of Eemshaven. Despite delays caused by the weather the Fugro […]