Search results for: DONG Energy

2263 results

A list of search results

  • 28 February 2017
    Business & Finance, Training & Education

    DONG Energy has revealed details of its Walney Extension community skills fund which will invest GBP 100,000 a year for the next 25 years into equipping people to work in engineering industries in the coastal areas of Lancashire and Cumbria.

  • 27 February 2017
    Authorities, Business & Finance, Grid Connection, Wind Farm Update

    ​DONG Energy has published an indicative area in which the cables carrying clean electricity from its proposed Hornsea Project Three offshore wind farm could be located, and is seeking feedback from local communities in Norfolk. Hornsea Project Three is a 2.4GW project that if built out to capacity will provide enough power for well over […]

  • 3 February 2017
    Business & Finance

    New Energy Investment S.à.r.l. (NEI) has launched an accelerated bookbuild offering of 26,500,000 of existing shares in DONG Energy to institutional investors, equivalent to 6.3% of the outstanding shares and voting rights in the Danish company.

  • 2 February 2017
    Business & Finance, Environment

    DONG Energy has decided to entirely phase out the use of coal as fuel at its power stations by 2023. Since 2006, DONG Energy has reduced its coal consumption by 73% and will replace it at the power stations with sustainable biomass to achieve the zero point.

  • 2 February 2017
    Business & Finance

    DONG Energy left 2016 with a net profit of DKK 12.2 billion (approx. EUR 1.6 billion) – DKK 11.2 billion (EUR 1.5 billion) higher than in 2015, when the company reported a net profit of DKK 1 billion (EUR 134 million).

  • 19 January 2017
    Business & Finance

    DONG Energy expects to divest its activities within exploration and production of oil and gas before the end of this year.

  • 13 January 2017
    Business & Finance, Operations & Maintenance, Wind Farm Update

    DONG Energy has agreed to enter into a long-term contract to provide operation and maintenance (O&M) services to the Lincs offshore wind farm located off the coast of North East Lincolnshire, UK. The new O&M contract for the wind farm follows the news that Centrica and Siemens Project Ventures agreed to sell their combined 75% […]

  • 6 January 2017
    Vessels

    DONG Energy has signed a contract with Solstad Offshore for two construction support vessels (CSVs) to be used on offshore wind projects. The offshore wind developer hired CSV Rem Installer for a period of 23 months with further 6 months option and an additional CSV from Solstad’s fleet, to be nominated at a later stage, […]

  • 15 December 2016

    DONG Energy is making a a multi-million pound investment in CS Wind’s new offshore tower manufacturing facility in Campbeltown, Scotland, which will give DONG Energy preferred access rights to towers for its offshore wind farms. The factory will be able to produce at least 50 towers a year and 70 jobs will be safeguarded as a result, […]

  • 2 December 2016
    Training & Education

    DONG Energy was amongst of 20 major companies, science centres and technical upper secondary schools from all over Denmark that invited approximately 1,000 primary, lower secondary and upper secondary school girls for a visit on Wednesday, 30 November, as part of an initiative that aims to attract more women into engineering studies. 44 second-year female students […]

  • 11 October 2016
    Environment, R&D, Technology

    DONG Energy has funded a trial of a high specification drone counting cliff-nesting seabirds at a Royal Society for the Protection of Birds (RSPB) reserve on the Yorkshire coast. The trial took place at Bempton Cliffs, a site which attracts over 250,000 birds annually, providing a breeding ground for many of them. A drone, provided by environmental […]

  • 10 October 2016
    Business & Finance, Wind Farm Update

    UK community fund administrator GrantScape has, on behalf of DONG Energy, issued a preliminary map showing which coastal communities in Yorkshire, Lincolnshire and North Norfolk Coast stand to benefit from the GBP 9.3 million East Coast Community Fund.  The East Coast Community Fund is being set up to ensure that local people benefit from the operation of two […]

  • 22 September 2016
    Operations & Maintenance, Vessels

    DONG Energy has revealed plans for a GBP multi-million investment in Grimsby to create the UK’s largest offshore wind operations and maintenance hub. Subject to planning approval, the new facility will be developed in the town’s Royal Dock and will initially support Westermost Rough, Race Bank and Hornsea Project One offshore wind farms, with the capacity […]

  • 5 September 2016
    Operations & Maintenance, Technology

    DONG Energy has awarded Siemens with a contract to upgrade the existing central Infrastructure Control System (ICS) on DONG Energy’s offshore wind farms. The contract covers hardware and services necessary for upgrading the existing central ICS. This includes upgrading hardware and configurations (servers, gateways) as well as the central software. Peripheral equipment hardware and software are not part […]

  • 10 August 2016

    A thousand hoisting operations from helicopters to wind turbines have been carried out so far at DONG Energy’s offshore wind farms, the offshore wind developer said via social media. “The distances to our offshore wind farms are increasing, and flying to work is becoming reality for many of our technicians who maintain our wind farms in the UK,” DONG […]

  • 9 August 2016
    Business & Finance, Operations & Maintenance, R&D

    DONG Energy has decided not to invest in a GBP 450 million offshore wind hub at the Able Marine Energy Park (AMEP) in the Humber after a recent report showed that UK east coast ports have the capability to support the pipeline of offshore wind projects which will be built out in the North Sea in […]

  • 4 August 2016
    Business & Finance

    DONG Energy recorded DKK 6.4 billion (EUR 860 million) net profit for the first six months of 2016, up 129% compared to DKK 2.8 billion net profit reported for the first half of 2015, largely driven by a strong growth in the company’s Wind Power division. The Danish energy company reported DKK 12.4 billion operating profit (EBITDA), a 19% increase compared to […]

  • 18 July 2016

    Atlas Professionals has secured a new frame agreement for the supply of Harbour & Offshore Logistics personnel with DONG Energy. The agreement is in place for the next 5 years and will allow Atlas to provide DONG Energy with personnel for all current and future Danish offshore wind projects, including Horns Rev 1 and 2, […]

  • 13 July 2016

    DONG Energy has chosen ERSG to provide contract professionals to support its Danish offshore wind farm projects over the next 5 years. Nigel Wilson, Head of Offshore Wind at ERSG said: “We are delighted to have been selected once again by DONG Energy to staff their Danish projects and my account management team and I […]

  • 5 July 2016
    Contracts & Tenders, Wind Farm Update

    DONG Energy will build Dutch offshore wind farms Borssele I and II. The company won the concessions with an average bid strike price, excluding transmission costs of EUR 72.70 per MWh during the first 15 years of the contract. After that, the wind farms will receive the market price. Executive Vice President and Head of Wind Power […]

  • 13 June 2016
    Authorities, Business & Finance

    DONG Energy’s admittance to trading and official listing of its shares on Nasdaq Copenhagen has today become unconditional after the selling  shareholders and underwriters invoked no termination or withdrawal rights pertaining to the Initial Public Offering launched on 9 June. Accordingly, the IPO has today proceeded to completion and the offer shares, other than the shares comprised by the overallotment […]

  • 6 June 2016
    Authorities, Business & Finance

    The minimum price target for DONG Energy’s shares which are expected to start trading on Nasdaq Copenhagen on 9 June has been raised, Reuters reported a source familiar with the matter as saying. The company’s owners have set a price range of between DKK 220 to DKK 255 per share, as opposed to initially announced […]

  • 26 May 2016
    Vessels

    Along with the design for DONG Energy’s service operations vessel (SOV), which will be done in cooperation with Østensjø Rederi, Rolls Royce will also provide ship equipment.  The company will supply the diesel electric main machinery, consisting of frequency controlled electric driven azimuth thrusters, super silent mounted transverse thrusters, DP2 dynamic positioning system, power electrical system, deck machinery, and […]

  • 26 May 2016
    Vessels

    DONG Energy has awarded Seacat Services with a contract for the supply of all crew transfer services at its 258MW Burbo Bank Extension project under development in the Irish Sea. The four-vessel charter contract, with durations of three to 11 months, is the second such agreement signed between Seacat Services and DONG Energy in 2016, following […]

  • 18 May 2016

    DONG Energy has ordered three substation topsides for its Hornsea Project One offshore wind farm from Bladt Industries. Bladt and its partner Semco Maritime deemed the order as historical, since this is the first time that a contract has been signed for three topsides at the same time. Bladt Industries is responsible for fabricating the steel structures of the substation […]

  • 17 May 2016
    R&D

    DONG Energy  has awarded Clinton, a Swedish marine survey company, a contract for a geophysical survey at the Hornsea Project Three site, so a more accurate geophysical baseline for the project area can be established. Clinton Marine Survey’s CEO, Martin Wikmar said: “This is the right step in our long term plan and also a high quality mark for our […]