Search results for: Bladt

2090 results

A list of search results

  • 11 April 2017
    Wind Farm Update

    The Hornsea Project One offshore substation Z13 arrived at Bladt Industries’ site in Aalborg last week, the company informed via social media, where it also published a photo of the first load out of its share of the Walney Extension transition pieces.

  • 12 October 2015

    On Friday morning, Bladt Industries carried out the upending of the jacket foundation for the topside of the Sandbank offshore wind farm’s substation. At Bladt’s quay in Aalborg, the 96 metres tall crane easily upended the two sides for the jacket each weighing 525 tonnes. Once both sides were in upright position, they were joined together with remaining […]

  • 20 April 2016
    Wind Farm Update

    The offshore substation for Sandbank offshore wind farm left Bladt Industries early this morning and is now on its way to the wind farm construction site.  On Friday morning, load out of the substation took place, while the jacket foundation load out  Saturday morning. Bladt’s part of the project includes design, construction and installation (EPCI […]

  • 21 August 2014
    Business & Finance

    This July, the Bladt team completed yet another successful project, as the Nordsee Ost substation left Bladt Industries headquarters in Aalborg, Denmark. The 1,800 tonnes substation was an exciting challenge for Bladt Industries to complete, as the goal was to finalize the project within 16 months – a very short time frame to conduct a project […]

  • 3 June 2019
    Contracts & Tenders

    Ørsted has contracted Bladt Industries to produce 135 transition pieces for the Hornsea Project Two offshore wind farm in the UK. The fabrication of the transition pieces is planned to begin this year at Bladt’s site in Aalborg, Denmark, with delivery expected to take place from mid-2020 to mid-2021. “We are proud that Ørsted have trusted Bladt Industries as […]

  • 29 March 2012
    Business & Finance

    Nordic Capital Fund VII (“Nordic Capital”) today announced the acquisition of Bladt Industries A/S (“Bladt” or “the Company”) from Maj Invest Equity, Industri Udvikling and Bladt management. Bladt, headquartered in Aalborg, Denmark, is an international steel contractor specializing in large-scale and highly complex steel structures. The Company serves three distinct markets, providing steel solutions for […]

  • 8 August 2018
    Business & Finance

    Danish Bladt Industries and the Taiwan-based Century Wind Power (CWP) have established a joint venture for the fabrication of offshore wind foundations for the Taiwanese market.

  • 22 August 2014
    Business & Finance, Wind Farm Update

    Bladt Industries will manufacture an offshore substation (OSS) for the Sandbank offshore wind farm in close cooperation with their long term partners on the fabrication of substations – Semco Maritime and ISC. Bladt Industries has signed an EPCI contract for the fabrication of the OSS for the upcoming Sandbank Offshore Wind Farm. The contract is signed with the […]

  • 31 March 2016
    Business & Finance

    Driven predominantly by work in the offshore wind industry, Bladt Industries wrapped up 2015 with an annual profit of DKK 63.5 million (approx. EUR 9 million), after a challenging 2014 which ended with a loss of DKK 6.7 million (approx. EUR 900,000). The company’s 2015 EBITDA was DKK 139 million (approx. EUR 18.7 million), a significant increase from DKK […]

  • 7 March 2014
    Business & Finance

    Bladt Industries has announced its participation in the EWEA conference and exhibition taking place from the 10th to the 13th of March 2014 in Barcelona. The company is deeply involved in the offshore wind energy development in Europe, but not only there. Bladt’s latest big achievement is the recently signed contract with the developers of […]

  • 13 June 2014

    The fabrication of the Gode Wind foundations, which Bladt Industries are fabricating for Dong Energy, is well on the way. This week the TP mockup was upended at Bladt’s upending site. After this, the Bladt team installed the concrete platform on the TP mockup, which is the first of 97 TP’s for the Gode Wind project. […]

  • 23 April 2019
    Grid Connection, Wind Farm Update

    Bladt Industries has installed the transformer on the offshore substation built for the Northwester 2 offshore wind farm in Belgium. According to the Danish company, three cranes were necessary for the installation of the 235t transformer on the substation. To remind, the substation topside began its journey towards Bladt’s premises in Aalborg from Mostostal Pomorze in […]

  • 19 December 2014

    The first transition pieces (TPs) for DONG Energy’s Gode Wind offshore wind farm are now lining up at the harbour at Bladt Industries’ facilities in Aalborg. Thirteen of the 97 transition pieces are being upended this week by Bladt’s team. The transition pieces, with a diameter of six meters and a height of approximately 30 […]

  • 22 June 2015
    Wind Farm Update

    On Friday 19 June, the 2nd load out of the 55 transition pieces (TP) for the Gode Wind 1 project was completed from Bladt Industries’ quayside in Aalborg. The load out was carried out by Bladt and after leaving Aalborg, the 500 tonnes heavy transition pieces were sailed to Eemshaven in the Netherlands. The Gode […]

  • 29 January 2019
    Business & Finance, Ports & Logistics

    The foundation production site being developed in Taiwan by a joint venture of Bladt and Century Wind Power (CWP) is taking shape, according to Bladt’s recent social media post. Bladt’s Chairman of the Board and Senior Management visited Taiwan last week to follow the progress of the construction and the establishment of the Century Bladt Foundation […]

  • 7 April 2017
    Business & Finance

    According to Bladt Industries’ 2016 annual results, the company saw a very favourable year with offshore wind projects as the main driver. Bladt reported a revenue increase from DKK 3 billion (approx. EUR 403 million) in 2015 to DKK 3.5 billion (approx. EUR 470 million) last year.

  • 23 February 2016

    Bladt Industries upended the first transition piece for the Veja Mate offshore wind farm, weighing 293.5 tonnes. As announced last summer, a joint venture between Bladt industries and EEW SPC won the contract for building foundations for the Veja Mate Offshore Wind Farm. Bladt’s scope in the project is to build 67 transition pieces which […]

  • 31 October 2012

    Bladt’s new 4000×145 mm plate roll has been installed and is now in full operation at their production facilities in Aalborg, Denmark. The new plate roll has the capacity to roll plates up to four meters wide and is one of the largest in Europe. In pace with everything in the industry increasing in size, […]

  • 23 March 2015
    Business & Finance, Wind Farm Update

    Iberdrola and Bladt Industries have signed a contract for the fabrication of 41 jacket foundations and 164 pin piles for the upcoming Wikinger Offshore Wind Farm in the German part of the Baltic Sea. “We are very pleased that we can continue serial fabrication of foundations at our facilities and hereby build on our strong track record […]

  • 2 May 2014
    Authorities

    Bladt Industries welcomed the Danish Minister of Climate, Energy and Buildings Rasmus Helveg Petersen at their Aalborg site today. The purpose of the visit was for the cabinet minister to see the facilities of Bladt Industries and get a behind-the-scenes look of a Danish company that contributes to offshore wind energy. Since Bladt Industries is […]

  • 21 December 2017
    Business & Finance, Jobs & Recruitment

    Bladt Industries has appointed Klaus Steen Mortensen as new CEO starting from 1 January 2018, and replacing Jan Kjærsgaard.

  • 9 October 2013

    Measuring up to 6.5 meters in diameter, the largest wind mill so far is now ready for blast cleaning and painting at Bladt Industries. The work has commenced and is expected to finish in week 46. The 132 meter wind mill is going to function as a test mill in Østerild, Denmark. The work takes […]

  • 13 August 2014
    Business & Finance

    Jan Kjærsgaard is joining Bladt Industries as CEO, replacing Peter Rindebæk, who will continue as COO and deputy CEO. Peter Rindebæk was appointed CEO of Bladt in 2005, and has since been an instrumental in developing Bladt into the successful company it is today. However, the Board of Directors and Mr. Rindebæk have agreed that he […]

  • 9 April 2013

    Bladt Industries are establishing a production site at Lindø Industrial Park based on another significant order for foundations for offshore wind. At Lindø, the company will have more than 30,000 square meters of production halls at our disposal and will create dedicated production lines for serial production of jacket foundations for offshore wind turbines. The […]

  • 3 May 2018
    Contracts & Tenders, Wind Farm Update

    Northwester NV, the developer of Belgian Northwester 2 offshore wind farm, has awarded Bladt Industries with an EPCI contract for the project’s offshore substation, under which Bladt – with its partners Semco Maritime and ISC – is in charge of designing, building and installing the substation. 

  • 24 April 2013

    Early this morning, a team of Bladt’s blacksmiths and engineers combined with raw crane power made use of the early sunrays to start raising the jacket foundation for the Borkum Riffgrund 1 offshore substation. Everything went as planned and the jacket and the substation will be ready for load out later this year as scheduled. […]