Search results for: Asian Hercules III

7 results

A list of search results

14 December 2017 Ports & Logistics, Vessels, Wind Farm Update

Floating crane Asian Hercules III has arrived to Peterhead Port to transfer and install suction bucket foundations on Vattenfall’s European Offshore Wind Deployment Centre (EOWDC).

26 March 2018 Ports & Logistics, Vessels, Wind Farm Update

The floating crane Asian Hercules III has installed the first of eleven suction bucket jacket foundations on Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) in the Aberdeen Bay, Scotland.

28 May 2018 Wind Farm Update

The eleventh and final MHI Vestas turbine was erected on 26 May at the European Offshore Wind Deployment Centre (EOWDC), where the inter-array cable installation works are also coming to an end, thus moving the project to the final commissioning phase before it generates its first power later this summer. 

24 April 2018 Ports & Logistics, Vessels, Wind Farm Update

Wind turbine number three and foundation number five are being installed on the European Offshore Wind Deployment Centre (EOWDC) in the Aberdeen Bay, with the northern cable installation also ongoing, Vattenfall, the owner and developer of the wind farm said.

9 April 2018 Vessels, Wind Farm Update

Wind turbine installation vessel (WTIV) Pacific Orca has started installing wind turbine towers on Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) in the Aberdeen Bay.

23 March 2018 Operations & Maintenance, Ports & Logistics, Wind Farm Update

The first two suction bucket jacket foundations for Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) have arrived at Peterhead Port, UK.

26 December 2017 Grid Connection, Ports & Logistics, Wind Farm Update

The 92.6 tonne transformer built for Vattenfall’s European Offshore Wind Deployment Center (EOWDC) is currently on its way to the installation site in Aberdeenshire, Scotland.