Search results for: butendiek

176 results

A list of search results

  • 24 January 2018
    Authorities, Business & Finance, Environment, Grid Connection

    The state government of Schleswig-Holstein has called for an additional expansion of Germany’s 2030 and 2035 offshore wind capacity targets.

  • 1 July 2014

    The offshore converter platform SylWin alpha was undocked at the Nordic Yards shipyard in Warnemünde last week. The 15,000 tonne yellow topside left the dock in the morning on the barge “Nordic Giant 101”: the platform – aligned diagonally across the dock – was built on the barge because SylWin, at 83 metres long and […]

  • 16 September 2014

    ITW Polymers Europe and ITW WindGroup distribute turnkey grouting solutions for on- and offshore wind turbine foundation and the recent innovations in the design of grouting equipment, made by ITW Polymers Europe, have already proved that it will have a major effect on the future Wind Turbine foundation installations. Based upon a partnership approach and […]

  • 3 May 2012
    Grid Connection

    Construction starts on the SylWin alpha offshore transformer platform at Nordic Yards, manufacturer of innovative special ships and major maritime projects for the offshore wind and other industries. The first steel blank cut was made in the presence of representatives of the client, Siemens Energy, and the end customer, TenneT, at the Rostock-Warnemünde yard.  SylWin […]

  • 10 October 2013

    A report from the European wind agency EWEA shows mixed statistics for the offshore wind industry so far this year. The first six months of 2013 saw a record high for installed and grid-connected turbines. Newly installed capacity doubled compared to last year, with 1,045MW. But investment and financing options are in sharp contrast with […]

  • 4 July 2022
    Contracts & Tenders, Wind Farm Update

    Siemens Gamesa and wpd have signed a Master Supply Agreement, including a 20-year service agreement, for the 927 MW Gennaker offshore wind farm in the German Baltic Sea. The wind turbines will have a nominal power of 8.6 MW and can reach up to 9 MW with the Power Boost option engaged. Located 15 kilometres off the […]

  • 9 July 2012
    Business & Finance, Grid Connection, Technology

    CG has been awarded the contract for the grid connection study and supply of main transformer 275 MVA and 2 reactors of 65 MVAr at the Northwind offshore wind farm in Belgium. The Northwind wind farm, previously named “Eldepasco”, will have an installed production capacity of 216 MW. The connection between the Offshore High Voltage […]

  • 22 March 2012
    Grid Connection

    CG has been awarded the contract for the grid connection study and supply of main transformer 275 MVA and 2 reactors of 65 MVAr at the Northwind offshore wind farm in Belgium. The Northwind wind farm, previously named “Eldepasco”, will have an installed production capacity of 216 MW. The connection between the Offshore High Voltage […]

  • 13 January 2015
    Business & Finance, Operations & Maintenance, Vessels, Wind Farm Update

    Siemens has signed a chartering agreement with ship owner Bernhard Schulte for two new service operations vessels (SOV) to be purpose-built for the long-term service and maintenance operations of the Gemini and Sandbank/Dan Tysk offshore wind power plants in the North Sea. Officials from Siemens and Bernhard Schulte together with its offshore wind affiliate WINDEA […]

  • 12 April 2012
    Ports & Logistics

    It takes a daring attitude to invest €4.5m in a 410m quay length, suited for oversized cargos, when one’s annual turnover does not exceed €600,000. The Port of Rama did exactly that two years ago, in anticipation of the Butendiek wind farm project starting just 40km from the port. The port’s Md Kristen Zedergaard is […]

  • 27 May 2014
    Technology

    The German navigation system manufacturer Raytheon Anschütz, together with its exclusive Norwegian distributor Syberg AS, has been awarded a contract for the supply of an advanced Synapsis Integrated Navigation System (INS) to two new state-of-the-art windpark service vessels. The experienced Norwegian shipyard Havyard Ship Technology in Leirvik / Sogn is designing and building the new […]

  • 23 August 2016
    Business & Finance, Operations & Maintenance, Wind Farm Update

    SgurrEnergy has secured a 12-year construction and operational monitoring contract for 396MW Merkur offshore wind farm in the German North Sea, for which the new financing structure was put in place this month. The scope of the contract includes monitoring of construction works and the financial and operational performance of the project to provide regular reporting […]

  • 5 November 2018
    Contracts & Tenders, Jobs & Recruitment, Operations & Maintenance, Training & Education, Wind Farm Update

    Germany-based Deutsche Windtechnik is establishing a new regional unit in Taiwan after securing a contract to provide services to wpd AG on the Yunlin offshore wind project.

  • 25 May 2017
    Business & Finance

    ESVAGT has appointed Claus T. Sørensen as its Managing Director for the UK, as the company is aiming to strengthen and expand its position in the UK offshore oil and gas and offshore wind markets.

  • 25 August 2014
    Business & Finance, Wind Farm Update

    Tekmar Energy has been awarded a multi-million pound project with Statoil and Statkraft on the Dudgeon Offshore Wind Farm for the supply of its patented technology TekLink®. As part of the cable contract VSMC will be procuring the TekLink® Mechanical Latch Cable Protection System which will be installed for the protection of the subsea power […]

  • 5 July 2013

    IHC Hydrohammer, part of IHC Merwede, has announced that it will supply piling equipment for the offshore foundation installation of two European offshore wind farm projects to Ballast Nedam Offshore. The long-term rental agreement between two leading companies in the offshore wind energy market is for the delivery of an S-2000 piling hammer with a […]

  • 5 June 2014

    SgurrEnergy will share its offshore wind expertise at the WINDFORCE 2014 exhibition and conference in Bremen, Germany. Key personnel from the company’s Hamburg office will deliver presentations to the key players and leaders of the offshore wind industry, and will be showcasing SgurrEnergy’s Galion Lidar, from stand B41 on 17-19 June 2014. Raya Peterson, principal […]

  • 12 August 2014
    Business & Finance, Operations & Maintenance, Technology

    The hull of one of Siemens’ new service operation vessels (SOVs) is on its way towards Norwegian Havyard shipyard, where it is supposed to arrive any day now. On July 19, 2014, the hull was launched at the Cemre shipyard in Turkey, reported Ingo Bischof, Siemens’ Project Manager for Offshore Service Germany in charge of […]

  • 14 July 2014
    Grid Connection

    Under the direction of Seaway Heavy Lifting, one of the world’s largest converter platforms has been installed off Sylt, an East Frisian Island. SylWin alpha platform, built by Siemens, is so large and heavy that the ingenious “float-over method” has been used to lift it from a pontoon onto the already installed jacket base. This approach has been used successfully in […]

  • 12 May 2014
    Grid Connection, Wind Farm Update

    Avantha Group Company CG installed its transformer substation at the Amrumbank West offshore wind farm. The renewable energy unit consists of 80 multi-megawatt wind turbines located 100 km off the German coast in the North Sea. The Amrumbank West offshore wind farm (which was completed along with CG’s consortium partners Fabricom GDF Suez, Iemants and […]

  • 19 March 2015
    Business & Finance

    Following the announcement of Nordsee One project reaching financial close, SgurrEnergy presented its role in the Nordsee One offshore wind farm to financial close, providing technical advisory services to a consortium of international commercial lenders involved in the non-recourse financing. The 332MW project, located around 40km North of the island of Juist in the German North Sea, is […]

  • 3 April 2013

    CG, along with its consortium partners, has been awarded a $44 million contract for the construction of an offshore HV substation in the Netherlands from Van Oord Offshore Wind Projects BV. CG, in consortium with Cofely Fabricom and Iemants, will design, deliver and install the high voltage offshore substation for the Luchterduinen project. The Luchterduinen […]

  • 19 December 2014
    Business & Finance, Grid Connection, Wind Farm Update

    Avantha Group Company CG has been awarded a contract from the Belgian offshore wind farm operator Northwind to provide operation and maintenance services for the 216 MW wind farm offshore substation on the Lodewijk bank, 40 km off the Belgian coast. This prestigious order follows a previous contract won by CG at the Northwind offshore […]

  • 11 May 2015

    Servicing around 2,200 wind turbines and 56 substations under fixed maintenance contracts, as well as repairs and assessments for a further 1,500 plants, Deutsche Windtechnik AG has experienced rapid growth since being established in 2007. Last year, the company experienced a near 40% in turnover, which passed the 70 million Euro mark for the first […]

  • 11 August 2022
    Contracts & Tenders

    Deutsche Windtechnik has signed contracts for seven additional offshore wind farms on which the company will carry out underwater inspections, with more than 300 annual inspection reports to be generated in the next two years. The company will, among other things, conduct back-to-back inspections on Trianel Windpark Borkum I, Sandbank, DanTysk, and Butendiek wind farms […]

  • 9 September 2014
    Technology

    The Austin Technology Incubator (ATI), part of the IC2 Institute at The University of Texas at Austin (UT), detailed the recent successful offshore demonstration of AdBm Technologies’ underwater noise abatement system. AdBm, a portfolio company of ATI’s Clean Energy Incubator, worked with its Dutch partner, Ballast Nedam, to deploy its system at the in the […]