Search results for: Offshore Switch Yard

145 results

A list of search results

  • 18 October 2012
    Operations & Maintenance

    Reflecting its renewed competitiveness in the international market for small and medium sized commercial vessels, Austal has secured a new contract for the design and construction of three wind farm support vessels. The 27 metre catamarans will be used by UK-based Turbine Transfers to support wind turbine installation and maintenance activities in European waters. Austal […]

  • 26 February 2014
    Authorities, Business & Finance, R&D, Technology

    Scotland’s marine energy sector is to benefit from almost £5 million as the distribution of funding from two initiatives to be announced by Energy Minister Fergus Ewing during the RenewableUK Wave and Tidal Conference and Exhibition in Belfast today. Speaking ahead of the event, Mr Ewing said five marine energy innovation projects are to benefit […]

  • 16 January 2012

      Many nations have set challenging targets for renewable energy production and it was in this setting that AMI held the latest global conference on Wind Turbine Blade Manufacture in December 2011 in Dusseldorf, Germany. The UK Minister for the Environment had announced potential plans for another 29,000 wind turbines mainly offshore, and Siemens Energy […]

  • 6 January 2012

    December 20th, significant wave heights of up to 3 metres, wind force 5. Perfect conditions to try Damen’s High Speed Service Vessel (HSSV) 2610 Marineco Mariah. Offshore WIND, along with (potential) customers, Siemens, DONG Energy, WindCat Workboats, Sima Charters, SeaZip, Vestas, Maritime Craft Services and Chevalier Floatels, just to name a few, and other press, […]

  • 15 April 2014

    There are some blunt facts about wind farm support vessels and some of them do not make pleasant reading. In the past four years there have been many wind farm support vessels built, some for existing companies and some for new companies. At the time they were ordered the prospects looked good with the UK […]

  • 26 April 2011

    South Boats Special Projects Ltd. announces the launch and commissioning of its 44th offshore wind farm crew transfer vessel, ‘MCS Zephyr’. The vessel is a South Catamaran 18m and is the first of a two boat order from Maritime Craft Services (Clyde) Ltd. to be delivered. ‘MCS Zephyr’ is the first vessel in the world […]

  • 5 May 2017

    “You can say we are very, very good at constructing pipes”, states Jan Bruggenthijs, CEO of steel manufacturer Sif Group based in the Netherlands. The company manufactures foundations for the offshore wind and oil and gas industries.

  • 11 November 2016

    Since the last time we looked at the status of Germany’s offshore wind industry only two years ago in July 2014, the number of operational offshore wind turbines has jumped from just 141 capable of producing 616MW to 835 grid connected turbines capable of 3,552MW in July 2016 and another 54 installed turbines not yet […]

  • 5 November 2018

    By Jon Harman, Head of Renewable Energy and Portfolio Director, New Energy Update Germany’s first offshore wind auction, in April 2017, was a watershed for the industry. Anticipating fierce competition, Ørsted and EnBW both pitched projects that would not require subsidy support, a concept undreamt of at the time. Since then, more than 2.5 GW […]

  • 6 September 2012

    Caterpillar Marine Power Systems, together with SAM Electronics, SCHOTTEL and Zeppelin Power Systems, have delivered an integrated power and propulsion package for “M/V Innovation”, one of the largest and most innovative offshore wind turbine installation vessels to date. The consortium of globally renowned marine specialists provided both shipowner and shipyard a single-source solution for all […]

  • 12 November 2018

    The effects and causes of fatigue that offshore wind crews experience are not fully understood within the sector, however, sharing health and safety (HSE) lessons can ultimately make the industry stronger, Kerrie Forster, Chairman of the UK National Workboat Association (NWA) Safety Forum and Operations Coordinator at Acta Marine, said in an interview with Offshore WIND.

  • 23 April 2015

    When NAM/Shell UK decided to invest in a ‘Walk-to-Work’ (WTW) offshore vessel for use with unmanned gas platforms, they requested Royal Niestern Sander (RNS) to make the preliminary design. The challenge was to design and build a stable platform for the transfer of personnel and equipment, to efficiently support the gas production platforms in the […]

  • 30 December 2011

    The two figures of “100 million” and “10 million” are extremely meaningful to each Chinese people. By the end of October, the total installed capacity of China Guodian Corporation surpassed 100 million kilowatts, among which wind power 10 million kilowatts, the symbolic WTG is located at Jiangsu Rudong Offshore (Intertidal) 150,000 kilowatts Large-Scale Demonstration Wind […]

  • 5 January 2015

    An important tool for reducing risks and costs in offshore wind is integrated, intelligent monitoring of the foundation structures. If well implemented an integrated monitoring approach will continuously track the ‘state of health’ of a foundation and identify in a very early stage the onset of structural problems. This allows early, low cost repairs, optimal […]

  • 30 May 2017

    Damen Offshore Wind – Shipyards Gorinchem ASV 7017 The Accommodation Service Vessel 7017 builds on the experiences gained from the larger ASV9020 in a smaller, lower-cost package. It facilitates optimal logistics flows for carrying out maintenance and repairs for the offshore wind industry. The vessel is equipped with a motion-compensated gangwayand-elevator solution, 3D motion compensated […]