Search results for: GE Haliade-X

289 results

A list of search results

  • 30 October 2019
    Grid Connection, Wind Farm Update

    ABB has secured a contract to supply its high-voltage direct current (HVDC) Light® converter systems to connect the Dogger Bank offshore wind project to the UK transmission network. In the first-ever use of the HVDC technology in the UK’s offshore wind market, ABB will supply technology with one of the smallest environmental footprints, due to the […]

  • 1 January 2020

    With 2019 now behind us, our editorial team looks back on what shaped the offshore wind industry in the last year of the decade. Below is a subjective list highlighting some of the most impactful events in the sector: UK Offshore Wind Strike Prices Slide Down to GBP 39.65/MWh Offshore wind projects selected in the […]

  • 13 July 2020
    Grid Connection, Wind Farm Update

    Offshore wind developer Ørsted has decided against constructing the interconnection facility for the Skipjack wind farm at Fenwick Island State Park in Sussex County, Delaware, US. In July 2019, Ørsted entered into a non-binding memorandum of understanding with the Delaware Department of Natural Resources and Environmental Control (DNREC) to construct the interconnection facility on a […]

  • 20 August 2020
    Contracts & Tenders, Wind Farm Update

    DEME Offshore has signed a contract with Dogger Bank Wind Farm to provide the inter-array cables for Dogger Bank A and Dogger Bank B offshore UK. Under the EPCI contract, DEME will in total supply, install and protect 650km of 66kV inter-array cables and all related accessories. Production will start in 2021 and the company’s […]

  • 27 February 2020

    SSE Renewables and Equinor, the developers of the 3.6GW Dogger Bank Wind Farm, have changed the names of the project’s phases to recognise their link to the historic Doggerland area where the wind farm will be built. The location used to be home to a Mesolithic community who lived across the Doggerland area around 12,000 […]

  • 16 September 2021
    Business & Finance, Wind Farm Update

    Vineyard Wind, a joint venture between Avangrid Renewables and Copenhagen Infrastructure Partners (CIP), has reached financial close on its 800 MW offshore wind farm in Massachusetts — the first large-scale offshore wind farm in the United States and the Americas region. The developer has raised USD 2.3 billion of senior debt through nine international and […]

  • 23 December 2020
    Authorities, Ports & Logistics

    The State of New Jersey is investing USD 250 million in a monopiles manufacturing facility that will serve the U.S. offshore wind industry. The facility will be located at the Paulsboro Marine Terminal in Gloucester County and is said to be the largest industrial offshore wind investment in the U.S. to date. EEW, Ørsted, as […]

  • 28 April 2022
    Vessels

    US-based WINDEA CTV LLC has started construction of its first three 30-metre hybrid-ready crew transfer vessels (CTVs) for the emerging US offshore wind market. Two of the Incat Crowther-designed CTVs will be constructed at St. Johns Shipyard in Palatka, Florida and one will be built at Gulf Craft in Franklin, Louisiana. The CTVs are scheduled […]

  • 3 June 2020
    Vessels

    The upgraded crane boom on jack-up vessel Pacific Osprey is fully operational, Swire Blue Ocean (SBO) said. The installation of Pacific Osprey’s new crane boom started in the Port of Esbjerg in mid-April and was completed on 30 May. The lift of the boom onto the jack-up was executed on 14 April by NOV with […]

  • 10 October 2022
    Technology

    Siemens Gamesa’s SG 14-222 DD offshore wind turbine prototype has produced 359 megawatt-hours (MWh) within a 24-hour time period which the turbine maker said was the most power one turbine has ever produced over this duration. According to Siemens Gamesa, this is enough energy to drive 1.8 million kilometres in a mid-sized electric car. The […]

  • 18 August 2021
    Contracts & Tenders, Wind Farm Update

    Jan De Nul Group, together with JDR Cable Systems as a subcontractor, will supply and install the inter-array cables for the Vineyard Wind 1 offshore wind farm in Massachusetts. Jan De Nul and the TFKable Group-owned JDR will deliver almost 210 kilometres of 66 kV cables that will connect the project’s 62 GE Haliade-X turbines […]

  • 21 August 2020
    Authorities, Wind Farm Update

    The Maryland Public Service Commission (PSC) has approved the use of GE Haliade-X 12 MW offshore wind turbine at Ørsted’s Skipjack offshore wind farm, to be built at a site some 30 kilometres off the Maryland-Delaware coast. Ørsted selected GE Renewable Energy as the preferred turbine supplier for the project in 2019, changing its initial […]

  • 5 November 2019

    We are bringing you a list of ten most read news on offshoreWIND.biz in the month of October 2019. Swedish Armed Forces Shoots Down Vattenfall’s Offshore Wind Farm Project Swedish energy company Vattenfall and its partner Wallenstam have canceled the Taggen offshore wind project in Sweden after the Swedish Armed Forces said no to the […]

  • 4 February 2021
    Authorities, Wind Farm Update

    The U.S. Bureau of Ocean Energy Management (BOEM) will resume the review process for the Vineyard Wind 1 offshore wind project, after the developer revoked its temporary withdrawal of the Construction and Operation Plan (COP) and requested the resumption of the process. In December 2020, Vineyard Wind, a joint venture between Avangrid Renewables and Copenhagen […]

  • 2 April 2020

    We bring you the ten most-read articles on OffshoreWIND.biz for the month of March 2020. Siemens Gamesa 11MW Turbine Prototype Goes Full Tilt Siemens Gamesa’s prototype SG 11.0-193 DD Flex wind turbine has produced 11MW of power, the turbine maker said. ABB Tech for Japanese Wind Turbine Installation Vessel ABB has won a contract to […]

  • 22 September 2020
    Ports & Logistics, Wind Farm Update

    Dogger Bank Wind Farm has confirmed Able Seaton Port in Hartlepool, UK, as the marshalling base for the wind turbine installation activities for the Dogger Bank A & B offshore wind project. As part of the agreements for the supply and service of 190 of GE Renewable Energy’s Haliade-X 13 MW wind turbines, the wind […]

  • 1 July 2020

    We bring you the ten most-read articles on OffshoreWIND.biz for the month of June 2020. Aegir Suffers Dropfall Incident Offshore Taiwan Heerema Marine Contractors’ (HMC) heavy lift vessel Aegir experienced a dropfall incident off the coast of Taiwan on 15 June at 16:42 local time. Siemens Gamesa 14 MW Turbine to Make European Debut Offshore […]

  • 8 September 2022
    Authorities, Business & Finance, Industry, R&D, Technology, Wind Farm Update

    A US federal judge in Boston has barred General Electric (GE) from ‘‘making, using, offering for sale, selling, importing (into), or installing in the United States” the Haliade-X offshore wind turbine after the jury found in June that the wind turbine infringed upon a patent held by Siemens Gamesa Renewable Energy. The jury and Judge […]

  • 19 July 2021
    Business & Finance, Jobs & Recruitment

    Vineyard Wind and the Southeastern Massachusetts Building Trades Council have signed a project labour agreement (PLA) for the 800 MW Vineyard Wind 1 offshore wind farm. “The historic signing of the nation’s first PLA for the offshore wind industry and the Vineyard Wind project are critical to our efforts to combat climate change, generate clean […]

  • 25 October 2022
    Wind Farm Update

    The installation work on the export cable for Vineyard Wind 1, the first commercial-scale offshore wind farm in the US, has now begun with Prysmian’s cable laying vessel (CLV) Cable Enterprise set to start installing the offshore part of the project’s link to the grid on land after a pre-lay grapnel run. According to the […]

  • 1 September 2022
    Contracts & Tenders, Wind Farm Update

    Vineyard Wind has signed contracts with Maine-based Ironhouse and Houston-based EverLine to support the Vineyard Wind 1 offshore wind project at various construction and operation stages. EverLine, a provider of energy compliance, technical, and security solutions, will deliver complete Supervisory Control and Data Acquisition (SCADA) integration for the 62 wind turbines, a system that will […]

  • 30 October 2019
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Norwegian offshore service company Aibel has won a contract to deliver converter platforms for the 3.6GW Dogger Bank offshore wind project. Aibel will deliver two converter platforms for the 1.2GW Creyke Beck A and the 1.2GW Creyke Beck B projects, with an option for a third platform for the 1.2GW Teesside A project at the […]

  • 21 September 2020
    Business & Finance

    A recent analysis from Rystad Energy has shown that using 14 MW wind turbines can reduce overall costs of large-scale offshore wind farms, even though these wind turbines themselves are more expensive. Rystad Energy looked at using next-generation turbines of various sizes for a 1 GW offshore wind farm, and the effect wind turbine choice […]

  • 2 November 2020

    OffshoreWIND.biz brings you the ten most-read articles on the site for the month of October 2020. Crane for Next-Gen Offshore Wind Turbines Coming to Market The Netherlands-based Tetrahedron has developed a new crane for next-generation offshore wind turbines, said to be designed to fit on both existing and new jack-up vessels. Construction Starts on World’s […]

  • 17 May 2022
    Environment, R&D, Technology

    Sif Group, representing KCI the engineers, GE Renewable Energy, and Pondera have signed a Memorandum of Understanding (MoU) for the feasibility study of AmpHytrite – a green hydrogen centralized offshore wind production project. The AmpHytrite project is aimed at mastering the complexity of a centralized offshore and off-grid hydrogen production unit and is aiming for […]

  • 17 February 2021
    Technology

    Siemens Gamesa has completed the first Siemens Gamesa B108 wind turbine blade. The 108-metre IntegralBlade® was cast in one piece using patented Siemens Gamesa blade technologies. This process eliminates weaker areas at glued joints and produces blades of optimum quality, strength, and reliability, the turbine maker said. The record-setting blade will be installed on the […]