Search results for: borssele v

117 results

A list of search results

  • 1 January 2018
    Authorities, Business & Finance, Environment, Operations & Maintenance, R&D

    The Offshore WIND editorial staff brings the most read news in 2017 chosen by you, our readers. From new technologies in the offshore wind industry to the development of subsidy-free bids, 2017 has shown us that the sector is developing faster than anyone had anticipated.

  • 28 November 2017
    Grid Connection, R&D, Technology

    Transmission system operator TenneT has laid out its ideas for supporting the possible further expansion of offshore wind energy in the Dutch North Sea.

  • 5 December 2011
    Business & Finance

    Already since May 2011 the wind farm EnBW Baltic 1 has been delivering green power from the Baltic Sea – since Friday its long-term financing is also in place: a banking syndicate comprised of the European Investment Bank (EIB), KfW IPEX-Bank, Landesbank Baden-Württemberg (LBBW) and NIBC Bank N.V. will extend a loan amounting to EUR […]

  • 28 November 2017
    Business & Finance, Ports & Logistics, R&D, Technology

    The Port of Rotterdam has joined the North Sea Wind Power Hub Consortium, which has thus far comprised TenneT TSO B.V. and Gasunie from the Netherlands, Energinet from Denmark, and TenneT TSO GmbH from Germany.

  • 21 July 2017
    Business & Finance, Grid Connection, Technology, Vessels

    To remind you of just how interesting the first half of 2017 was, the Offshore WIND editorial staff compiled a list of the most read articles published during first six months of this year. Even though the industry has been notably active since the beginning of July as well, our team has decided to set the time parameter to end with 30 June and thus provide a new overview in addition to our annual Offshore ReWIND.

  • 18 September 2013
    Grid Connection, Wind Farm Update

    The munitions clearing company and the Lower Saxony munitions disposal service issued the release for the last section of the Riffgat route on September 13. The route was planned by the wind farm operator and approved by the state of Lower Saxony; transmission system operator TenneT was forced to take over the ready-planned and localised […]

  • 26 February 2013

    The OWI-Lab team attended the EWEA 2013 event in Vienna this month, the largest wind energy conference in Europe. More than 8000 participants and nearly 400 companies attended the conference and exhibition this year. Although 11.000 MW of wind energy capacity was installed last year, the wind industry is in fact facing tough times just […]

  • 16 March 2011
    Technology

    Owners and operators are under increasing pressure to reduce operational costs while improving the efficiency of their wind farm portfolios. GL Garrad Hassan has developed a new software tool to help facilitate this. WindHelm provides a single platform for the monitoring, optimisation and control of any combination of operational turbines, farms and portfolios. It gives […]

  • 10 September 2014
    Business & Finance, Grid Connection, Technology

    The Dutch transmission system operator TenneT TSO B.V. and its Danish counterpart Energinet.dk have given their final approval for the development of COBRAcable. This new, over 300-km-long subsea direct-current electricity connection (interconnector), will directly connect the Dutch and Danish power grids. Completion of the cable is scheduled early 2019. ‘Green’ cable’  “An important purpose of […]

  • 2 January 2018

    The Offshore WIND editorial team brings you a list of what, in our opinion, were the most significant developments in the offshore wind industry in 2017. Germany Accepts First Subsidy-Free Offshore Wind Auction Bid Germany’s Bundesnetzagentur has selected three offshore wind projects by DONG Energy and one project by EnBW in the first auction for […]

  • 7 August 2013

    Offshore wind energy continues to experience an increasing share of the electricity generation market in Europe. Both the UK and Germany have set up ambitious goals to further expand their offshore wind energy capacity. Relatively smaller countries such as Belgium for example are also stepping up their offshore capacity and are investing in research projects […]

  • 30 May 2017

    Van Oord Our leading position in offshore wind was in 2019 displayed in the projects Norther, Deutsche Bucht and the Borssele sites III & IV and V. For the Norther project, Van Oord’s offshore installation vessel Aeolus installed all foundations and turbines. Our cable-installation vessel Nexus installed all inter array cables and the export cable. […]

  • 30 May 2017

    C-Ventus Offshore Windfarm Services B.V. Installation Support | BoP Inspections, Repair & Maintenance | Decommissioning Above water-line installation services • Rope access • Cable Pull in • Termination & testing • Foundations inspections & repair • Coating inspections & repair • Confined space inspections Subsea installation services • Diving & ROV works • Survey • […]