1157 results found for 'Hywind Demo'

1157 results found for 'Hywind Demo'
Order results by

A list of search results

  • 14 April 2015
    Business & Finance

    Baker Consultants Limited, a seven year-old ecological consultancy that recently began work on Gode Wind 1 & 2 offshore wind sites, has experienced significant growth in the last few years and proved its competence within the offshore wind industry by working on two major projects, including Borkum Riffgrund 1. In an interview with Offshore WIND, […]

  • 2 February 2022
    Vessels

    Offshore wind turbines are growing in size as technology advances and demand for renewable energy soars but installing them could be a headache for operators as demand will outpace the supply of capable vessels by 2024, Rystad Energy research shows. Operators will have to invest in new vessels or upgrade existing ones to install the […]

  • 20 January 2025
    Business & Finance, Business development, Cables, Collaboration, Energy Islands, Environment, Green Hydrogen, Grid Connection, Industry, Infrastructure, Innovation, Market Outlooks, Offshore Platforms, Outlook & Strategy, Planning & Permitting, Technology, Transition

    Energy islands are no longer being considered in the Netherlands. Instead, the focus has been shifted to offshore energy hubs and interconnectors. With rising (cyber)security concerns as a result of a number of recent incidents in European waters, as well as the Russia-Ukraine war, diversification of the energy system is high on the agenda. Offshore […]

  • 30 November 2023
    Business & Finance, Business development, Collaboration, Environment, Fixed-Bottom, Floating Wind, Grid Connection, Industry, Operations & Maintenance, Outlook & Strategy, Planning & Permitting, Ports & Logistics, Power-to-X, Project Updates, Supply Chain, Transition

    The offshore wind industry, now the linchpin between several offshore energy industries, is calling for both innovation and accelerating deployment, while also making sure one does not impede the progress of the other.  

  • 11 March 2013

     Patrick Kron was appointed Chairman & CEO of Alstom on 11 March 2003. In the decade between 2003 and 2013, the company battled for survival from 2003 to 2005, then enjoyed strong growth in the years between 2006 and 2009, and finally coped with the global financial and economic crisis from 2010 onwards. On 21 […]

  • 6 September 2012

    Caterpillar Marine Power Systems, together with SAM Electronics, SCHOTTEL and Zeppelin Power Systems, have delivered an integrated power and propulsion package for “M/V Innovation”, one of the largest and most innovative offshore wind turbine installation vessels to date. The consortium of globally renowned marine specialists provided both shipowner and shipyard a single-source solution for all […]

  • 8 September 2014
    R&D

    The most extensive science and engineering research project to take place in Caithness for many years is occurring this month (September, 2014) from a base at Gills Harbour, on the shores of the ‘s Inner Sound. Expensive high-tech equipment, under the TIME initiative, has been laid on the Sound’s seabed from the 25-metre-long ‘multi-cat’ vessel […]

  • 7 August 2013

    Offshore wind energy continues to experience an increasing share of the electricity generation market in Europe. Both the UK and Germany have set up ambitious goals to further expand their offshore wind energy capacity. Relatively smaller countries such as Belgium for example are also stepping up their offshore capacity and are investing in research projects […]

  • 8 October 2012

    On 27 September, Offshore WIND was present, along with other press and 250 industry representatives, at the official inauguration of the Large Climate Test Chamber which forms part of the Offshore Wind Infrastructure Application Lab (OWI-Lab), strategically located in a warehouse on the Churchill Dock in the port of Antwerp, Belgium. This public testing and […]

  • 27 November 2024
    Business & Finance, Business development, Environment, Fixed-Bottom, Floating Wind, Grid Connection, Industry, Infrastructure, Jobs & Recruitment, Operations & Maintenance, Outlook & Strategy, Planning & Permitting, Ports & Logistics, Power-to-X, Project Updates, R&D, Supply Chain, Technology, Training & Education, Vessels

    Welcome to the Live Blog! That’s a wrap! As OEEC 2024 comes to a close, Navingo invites all attendees to join for the final celebration! After two dynamic days of exploring innovations in the offshore energy sector, it’s time to relax, reflect and network over drinks and bites. Join us at the Stage for this […]

  • 2 October 2012

    In the past 12 months we have seen orders for new Wind Turbine Installation Vessels placed, new builds started and others completed and delivered. These vessels have got bigger and stronger’wlth larger cranes, and higher jacking possibilities. The specifications of almost every dimension have increased. Offshore WIND has spoken to some of the new owners […]

  • 19 October 2023
    Fixed-Bottom, Project Updates, Wind Farm Update

    DEME’s jack-up Sea Installer has installed the first GE Haliade-X 13 MW wind turbine at the Vineyard Wind 1 offshore wind project in the US. The completed turbine is comprised of one tower, three 351-foot-long blades (about 107 metres), and a nacelle. The fully assembled unit represents the largest turbine in the western world, with […]

  • 4 November 2024
    Fixed-Bottom, Project Updates, Wind Farm Update

    Dominion Energy has revealed that 78 monopile foundations and four pin piles for one offshore substation were installed at the 2.6 GW Coastal Virginia Offshore Wind (CVOW) project in the US during the first installation season. Dominion Energy said that it achieved its initial goal of installing at least 70 monopiles into the seafloor 27 […]