Search results for: hornsea one

650 results

A list of search results

  • 29 October 2015
    Business & Finance

    DONG Energy’s earnings were 14% higher in the first nine months of 2015, compared with the same period last year, the company reported today in its interim financial report for 9M 2015. DONG said earnings (EBITDA) were up by 14% in the first nine months from DKK 13.0 billion (approx. EUR 1.7 billion) in 2014 to DKK 14.8 billion (approx. […]

  • 1 September 2016
    Authorities, Business & Finance, Environment, Grid Connection, Operations & Maintenance, R&D, Technology, Training & Education, Vessels, Wind Farm Update

    USA Just Got Its First Offshore Wind Farm “The Block Island Wind Farm is now fully constructed,” Jeff Grybowski, Deepwater Wind’s CEO, informed via social media on 18 August. Bilfinger Exits Offshore Wind Foundations Business Germany’s VTC Group Munich has bought Bilfinger’s share in Bilfinger Mars Offshore, a Poland-based manufacturer of steel foundations for offshore […]

  • 12 August 2015

    The UK is missing out on vital investment in manufacturing to support offshore wind to Germany and other countries because of the current lack of clarity in the government’s future strategy for offshore wind, an industry champion claims. Germany and other countries are being allowed to surge ahead threatening the UK’s position as world leader […]

  • 8 March 2023
    Operations & Maintenance

    World’s leading offshore wind developer Ørsted has signed a collaborative agreement with UK-based Renewable Parts for parts refurbishment services for its offshore wind turbine operations. Initially focused on Ørsted’s UK operations, Renewable Parts will work with Ørsted to increase the volume of parts reused within offshore operations, developing technology that could increase sustainability and reduce the […]

  • 17 June 2022
    Contracts & Tenders, Operations & Maintenance, Ports & Logistics

    SeAH Wind Ltd, a subsidiary of South Korea’s pipe manufacturer SeAH Steel Holdings, has received planning approval for its proposed GBP 300 million UK XXL monopile factory to be built at Teesworks. Site works are scheduled to commence in July with overall completion anticipated in 2024. The 40-metre high, over 800-metres long building, part of the Teesside’s […]

  • 3 September 2013

    The crew of Tidal Transit’s third personnel transfer vessel, the Tia Elizabeth, flew out to the shipyard in Cartagena in Spain in late August to sail her up from the Mediterranean. She left Cartagena for the port of Grimsby on 22 August. Tia Elizabeth has immediately gone to work on a short contract for RES […]

  • 25 July 2019
    Business & Finance

    Europe added 1.9GW of new offshore wind capacity in the first half of 2019, up from the 1.1GW installed in the same period last year, according to WindEurope. Countries that contributed to the new installations are the UK with 931MW, including Ørsted’s Hornsea Project One offshore wind farm, Denmark with 374MW, Belgium with 370MW and Germany […]

  • 30 April 2021
    Business & Finance, Operations & Maintenance, Wind Farm Update

    Leading offshore wind developer Ørsted has suggested that a scour protection method which left the inter-array cables unstabilised could be the potential reason for an up to DKK 3 billion (EUR 403 million) issue across up to ten wind farms in Europe. As reported earlier, Ørsted first became aware of the problem earlier this year […]

  • 23 November 2018
    Business & Finance, Training & Education

    Ørsted has named the winners of the second round of its annual GBP 75,000 East Coast Skills Fund, part of the company’s GBP 465,000 East Coast Community Fund 20-year annual commitment and community engagement programme for Hornsea Project One and Race Bank offshore wind farms.

  • 12 July 2016

    A GBP 10 million East Coast Community Fund announced in April by DONG Energy is now open to public consultation, with national grant-making charity GrantScape appointed to complete the consultation process and to administer the Fund. The Fund will ensure that local people benefit from the operation of two of the DONG Energy offshore wind farms […]

  • 21 March 2018
    Operations & Maintenance, Ports & Logistics, Vessels, Wind Farm Update

    Siemens Gamesa has shipped out the first nacelles for the 309MW Rentel offshore wind farm from Cuxhaven, Germany, to the installation port in Ostend, Belgium.

  • 12 February 2019
    Business & Finance, Vessels

    Fred. Olsen Ocean Ltd. (FOO), owner of Fred. Olsen Windcarrier and Universal Foundation Norway, has reported NOK 413 million (EUR 42 million) in operating revenues in Q4 2018, a 13% increase compared to the same period in 2017, partly attributed to higher utilization of Brave Tern and Bold Tern. According to the company, the two jack-up vessels […]

  • 28 November 2018
    Business & Finance

    Ørsted has raised its 2025 offshore wind target from 11-12GW to 15GW as part of the group’s development plan to invest DKK 200 billion (approximately EUR 26.8 billion) in renewable energy in the next seven years.

  • 8 August 2013
    Business & Finance, Operations & Maintenance

    RES Offshore has recently signed an Operations and Maintenance (O&M) services contract with Forewind for two met masts in the Dogger Bank Round 3 zone.  These met masts are the furthest offshore of any in the UK and RES will be delivering scheduled and unscheduled maintenance for the structures and instrumentation systems including all work […]

  • 29 November 2016
    Business & Finance, Vessels

    MacGregor, part of Cargotec, has won davit orders for two 81-metre service operation vessels (SOVs) designed to act as ‘mother-ships’ for wind turbine technicians which will service DONG Energy’s Race Bank and Hornsea Project One offshore wind farms in the UK part of the North Sea. The contracts have been placed by Spanish shipyard Astilleros Gondan, responsible […]

  • 7 October 2013

    Today marks the official opening of Fugro’s expanded soils testing laboratory at the Group’s UK headquarters in Wallingford, Oxfordshire, by The Mayor of Wallingford, Councillor Bernard Stone. An investment of over £1 million has been made in increasing the capacity and in state-of-the-art equipment, as a direct result of the significant increase in the number […]

  • 6 April 2022
    Operations & Maintenance, R&D, Technology

    Dutch offshore foundations manufacturer Sif has signed a memorandum of understanding (MOU) with Pict Offshore to integrate the Get Up Safe (GUS) system, as standard, into its Skybox TP-less monopile foundation. The GUS system is a heave compensated personnel lifting solution that is said to transform the way in which maintenance technicians access offshore wind […]

  • 22 September 2016
    Operations & Maintenance, Vessels

    DONG Energy has revealed plans for a GBP multi-million investment in Grimsby to create the UK’s largest offshore wind operations and maintenance hub. Subject to planning approval, the new facility will be developed in the town’s Royal Dock and will initially support Westermost Rough, Race Bank and Hornsea Project One offshore wind farms, with the capacity […]

  • 27 July 2017
    Wind Farm Update

    DONG Energy has today published a Preliminary Environmental Impact Report (PEIR) containing new information about its Hornsea Project Three offshore wind project. The report is part of a wider formal public consultation that will run from today (27 July) to 20 September 2017.

  • 7 July 2017
    Business & Finance, Vessels

    GeoSea is set to acquire the full ownership of A2SEA, owned by DONG Energy and Siemens, after the three companies signed an agreement today, 7 July. 

  • 11 September 2017
    Business & Finance

    After the UK government awarded three offshore wind projects with Contracts for Difference (CfDs), RenewableUK and Offshore Renewable Energy (ORE) Catapult commented on the news, highlighting the major decline in the cost of offshore wind.

  • 4 May 2016
    Business & Finance

    In its annual results for 2015, Mainstream Renewable Power marked the sale of the Hornsea Project One to DONG Energy in Q1 2015 as part of its strategy to exit the offshore wind market. The company, which reported a profit after tax of € 96.0 million in 2015 (compared to a loss of € 46.6 million in […]

  • 9 May 2022
    Vessels

    ESVAGT has picked HAV Design, a subsidiary of HAV Group ASA, to develop a service operation vessel (SOV) that will provide support to the offshore wind farms in Ørsted’s UK East Regional programme. Under the agreement, HAV Design will deliver both the ship design and an integrated equipment package including the propulsion system, engines, propellers, […]

  • 30 November 2018
    Environment, Operations & Maintenance, Ports & Logistics, Technology

    Focus Consultants has won a contract to deliver sustainability services for Ørsted’s East Coast Hub which is currently under construction on the Royal Docks at Grimsby, Lincolnshire.

  • 19 June 2017
    Operations & Maintenance, Training & Education

    DONG Energy has partnered with the Grimsby Institute to offer new offshore wind turbine technician apprenticeships.

  • 27 May 2021
    Business & Finance, Technology, Wind Farm Update

    Ørsted and POSCO Group, one of the largest conglomerates in Korea, have signed a Memorandum of Understanding (MoU) to strengthen collaboration on offshore wind and renewable hydrogen in Korea. POSCO and its affiliates will apply the group’s joint capabilities to support the development of Ørsted’s 1.6 GW offshore wind projects off the coast of Incheon […]