1968 results found for 'BOA'

1968 results found for 'BOA'
Order results by

A list of search results

  • 14 October 2025
    Business & Finance, Business development, Floating Wind, Research & Development

    BOA and BrestPort, the company managing the commercial port of Brest in France, have decided to collaborate on the development of floating offshore wind turbine launching methods from port facilities into open water, as well as supporting the development of the related port infrastructures. Under the agreement, the partners will focus on studying and evaluating […]

  • 25 February 2026
    Vessels

    Allseas’ new cargo barge Braveheart, built by the CIMC Changhong Shipyard, which held a keel-laying ceremony for the new vessel in April 2025, has now departed China for the Netherlands. Braveheart was purpose-built to fit precisely within Pioneering Spirit‘s bow slot to enable seamless transfer of offshore structures, from decommissioned platforms heading ashore to newly […]

  • 12 November 2025
    Floating Wind, Foundations, Supply Chain, Technology

    Norwegian floating wind platform developer Odfjell Oceanwind has received a Basic Design Approval (BDA) from DNV for its Deepsea Star semi-submersible floater design. The BDA covers the use of the design with the SG 14‑236 DD 15 MW turbine from Siemens Gamesa in a wide range of offshore conditions. The approval was granted in accordance […]

  • 19 January 2026
    Business & Finance, Cables, Grid Connection, Outlook & Strategy, Vessels

    Norway-headquartered subsea services provider OMS Group has signed contracts with Norwegian shipbuilder Ulstein for the design and construction of two cable-laying vessels (CLVs). Designed by Ulstein Design & Solutions, the ULSTEIN SX252 vessels will be 130 metres long and 22 metres wide and will have a capacity of up to 6,500 tonnes of cable. “This […]

  • 20 February 2026
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    Boskalis has completed the preparation of 150 kilometres of inter-array cable routes at the 1.5 GW Baltica 2 offshore wind farm site in Poland. In 2023, Boskalis was awarded a contract for the transportation and installation of export and inter-array cables for the Polish offshore wind farm, owned by PGE and Ørsted. Under the contract, the Dutch […]

  • 26 November 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Operations & Maintenance, Supply Chain

    Føn Energy Services has secured a five-year contract to provide inspection, repair and maintenance services across six Dutch offshore wind farms after winning a combined tender issued by their owners, the company revealed on 26 November at the Offshore Energy Exhibition & Conference (OEEC) in Amsterdam. The award covers Borssele 3&4, owned by the Blauwwind […]

  • 6 November 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    ARB Wind has been awarded a multi-year contract for above water foundation inspections and Balance of Plant (BoP) services by Neart na Gaoithe (NnG) Offshore Wind Limited for the 450 MW offshore wind farm in Scotland. ARB Wind will provide dedicated BoP technicians to deliver a wide range of services across NnG’s offshore and onshore […]

  • 29 October 2025
    Business & Finance, Collaboration, Outlook & Strategy

    UK-headquartered Acteon and Taiwan-based marine solutions provider Wynnergy Marine have signed a strategic Memorandum of Understanding (MoU) to jointly deliver renewable energy projects across the region. The partnership supports offshore wind growth in Taiwan by providing integrated solutions that combine subsea services and local marine vessels. Together, the companies combine Acteon’s knowledge in geophysical and […]

  • 18 December 2025
    Business & Finance, Cables, Contracts & Tenders, Fixed-Bottom, Supply Chain

    ScottishPower Renewables has selected Nexans as the supplier of 66 kV accessories for the East Anglia Three offshore wind project in the UK. Under the contract, Nexans will deliver T-connectors, bushings, junction boxes and cable lugs, and pre-terminated power cables, which the company says are all field-proven and engineered to deliver reliable electrical continuity from […]

  • 3 December 2025
    Contracts & Tenders, Fixed-Bottom, Supply Chain

    XOCEAN has been awarded a series of five-year contracts in the Netherlands, under which the company will deliver bathymetric survey services for six offshore wind farms. The agreements, coordinated by Eneco on behalf of the wind farm owners, are for Borssele 3&4, owned by the Blauwwind consortium; Borssele 5, owned by Two Towers; Eneco Luchterduinen; Hollandse Kust Noord, owned […]

  • 11 December 2025
    Contracts & Tenders, Fixed-Bottom, Grid Connection, Manufacturing, Offshore Platforms, Supply Chain

    The GE Vernova-Seatrium consortium has been awarded a contract to deliver the offshore converter platform for TenneT’s 2.2 GW BalWin5 offshore grid connection in the German North Sea. The contract is the fourth one awarded under the five-year framework agreement that GE Vernova and Seatrium signed with TenneT in 2023, and marks the consortium’s first […]

  • 4 February 2026
    Business & Finance, Vessels

    Windward Offshore has taken delivery of its second commissioning service operation vessel (CSOV), Windward Paris, from Vard, which delivered the new vessel ahead of schedule at its Vard Brattvaag yard, according to the vessel owner. The CSOV follows the delivery of the company’s first vessel of this kind in October 2025, Windward Athens. The new […]

  • 27 January 2026
    Authorities, Fixed-Bottom, Planning & Permitting

    The Government of Vietnam has assigned sea areas for offshore wind surveys to two state-owned companies, Petrovietnam and Vietnam Electricity (EVN), which are allowed to conduct site investigations for their projects for up to three years without needing to pay concession fees. EVN has been granted 240 square kilometres of sea area offshore the Long […]

  • 11 November 2025
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    All 72 wind turbine foundations at the Danish Thor offshore wind site, developed by RWE, are now equipped with secondary steel and ready for the wind turbine installation, which is expected to start in the spring of 2026. The installation of the secondary steel structures, including boat landings, main access platforms, and internal cassettes, was […]

  • 26 February 2026
    Business & Finance, Cables, Contracts & Tenders, Fixed-Bottom, Supply Chain, Vessels

    A consortium of Boskalis and TKF has signed a contract with Skyborn Renewables for the supply and installation of inter-array cables for the Gennaker offshore wind farm in Germany. Under the contract, the consortium will deliver the complete inter-array cable system connecting the 63 Gennaker wind turbines. TKF will manufacture approximately 140 kilometres of 66 […]

  • 19 November 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    Ørsted has completed the 2025 foundation installation campaign at the Sunrise Wind offshore project site in the US and is now commencing cable installation works on both its projects under construction in the Northeast US, Revolution Wind and Sunrise Wind. According to the latest Notice to Mariners from the developer, Bokalift 2 and Bokalift 1 […]

  • 19 December 2025
    Fixed-Bottom, Grid Connection, Onshore Infrastructure, Project Updates, Wind Farm Update

    Four transformers and other high-voltage power equipment necessary for power transfer to the Polish national grid have been delivered to the construction site of the onshore substation for the Baltica 2 offshore wind farm, being built by a joint venture of PGE and Ørsted in the Polish Baltic Sea. The onshore infrastructure for the offshore […]

  • 30 October 2025
    Business & Finance, Vessels

    Dong Fang Offshore (DFO) has signed a Memorandum of Understanding (MoU) with GO Offshore (GO), establishing a framework for future cooperation in the offshore wind farm supporting vessel business, as well as offshore oil and gas vessel operations. Under the agreement, DFO will provide vessels to GO for offshore wind and offshore oil & gas […]

  • 7 November 2025
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    All monopile foundations for the wind turbines have been installed at Nordseecluster A, the first phase of the 1.6 GW Nordseecluster offshore wind development in Germany, owned by RWE and Norges Bank Investment Management. Each of the 44 monopile foundations measures approximately 85 metres in length and weighs an average of 1,500 tonnes. Before installation, […]

  • 13 March 2026
    Cables, Fixed-Bottom, Grid Connection, Project Updates

    Belgian offshore contractor Jan De Nul plans to install three subsea power cables and a fibre optic cable simultaneously on several upcoming offshore grid connection projects for TenneT, introducing what the company describes as the industry’s first such installation. The work relates to the BalWin4, LanWin1, LanWin5 and BalWin5 grid connection projects in the German […]

  • 13 January 2026
    Business & Finance, Operations & Maintenance

    SeaRenergy Offshore Holding has acquired 100 per cent of the shares in hemmerschütz Solution, an offshore maintenance and repair services provider based in Germany. SeaRenergy, which took over hemmerschütz Solution on 28 November 2025, says this enables the company to complement its established offerings in engineering, marine services, QHSE and offshore experts with the direct […]

  • 16 October 2025
    Business & Finance, Contracts & Tenders, Operations & Maintenance, Supply Chain

    IOG Wind, formerly known as CWind Taiwan, has secured an operations and maintenance (O&M) contract for the Balance of Plant (BoP) for the 1 GW Hai Long offshore wind project in Taiwan. The scope will cover inspections of newly installed offshore substations, as well as performing inspection, maintenance, and troubleshooting of transition pieces, subsea foundations, […]

  • 15 October 2025
    Fixed-Bottom, Operations & Maintenance, Technology

    RWE said on 15 October it had completed more than 80 successful cargo drone flights to offshore wind turbines in Germany, marking what it described as a milestone for the offshore wind industry. The company said the tests demonstrated the technical feasibility of using drones to deliver tools and spare parts directly to wind turbines […]

  • 7 October 2025
    Technology, Vessels

    Robosys Automation has secured a new contract to retrofit a Damen crew transfer vessel (CTV) with its Voyager AI maritime autonomy software. This is the second CTV designed and built by Damen to be fitted with the UK company’s autonomy software. Robosys Automation left the client who ordered the retrofit unnamed, only saying that it […]

  • 25 September 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    All 72 monopile foundations have been installed at RWE’s Thor offshore wind farm in the Danish North Sea. The monopiles are around 100 metres in length and weigh up to 1,500 tonnes each. The units were shipped from the heavy-lift terminal in Eemshaven, in the Netherlands, to the Thor construction site in the Danish North […]

  • 11 September 2025
    Vessels

    Swiss-based Allseas has placed an order with China’s Guangzhou Shipyard International for a semi-submersible heavy transport vessel, which the company plans to use in executing TenneT’s 2 GW offshore wind programme. The vessel, named Grand Tour, will have a load capacity of 40,000 tonnes, designed to carry the world’s largest offshore structures across oceans and […]