Baltic 2 TPs Built and on Their Way to Bladt Industries

The order for AMBAU to manufacture 41 transition pieces (TPs) for Bladt Industries A/S to be used in the EnBW ...

read more →

EEW SPC to Build Monopiles for Sandbank, Bladt in ...

EEW SPC to Build Monopiles for Sandbank, Bladt in Charge of TPs

EEW Special Pipe Constructions GmbH has been awarded a contract for the manufacturing of foundations for the ...

read more →

Bladt to Deliver Last Batch of Butendiek TPs

Bladt to Deliver Last Batch of Butendiek TPs

The last 12 of the total 80 transition pieces (TPs) for the Butendiek offshore wind farm will be delivered this ...

read more →

First Baltic 2 TPs Gone to Construction Site

First Baltic 2 TPs Gone to Construction Site

The first set of transition pieces (TPs) for EnBW’s Baltic 2 offshore wind farm has left the port in Rostock on ...

read more →

Ten Monopiles and TPs Already Installed at Westermost Rough

Ten Monopiles and TPs Already Installed at Westermost Rough

With the departure of the installation vessel Innovation from the port Aalborg, GeoSea has recently started the 3rd ...

read more →

VIDEO: Loadout of TPs for East Anglia OWF

VIDEO: Loadout of TPs for East Anglia OWF

The following is a video that shows Transitions Pieces (TPs) and Platforms being loaded at Steel Engineering Ltd ...

read more →

EEW SPC to Provide Monopiles, TPs for EnBW Baltic 2 (Germany)

EEW SPC to Provide Monopiles, TPs for EnBW Baltic 2 (Germany)

After already manufacturing the foundations for the OWF EnBW Baltic 1, EEW Special Pipe Constructions GmbH has now ...

read more →