VIDEO: Block Island Cable Installation

Kokosing’s Durocher Marine Division installed six miles of subsea cables for America’s first offshore wind farm off Block Island, Rhode Island.

Source: YouTube/Screenshot

All of the cables for the 30MW Block Island wind farm were installed by the end of July 2016.

The wind farm came online on 12 December, feeding the first power generated by offshore turbines to the grid.